Managing inter-departmental project delivery to enhance customer satisfaction

Q2 Engineering
Sandiso Cosa, E. Ogbeifun, J. Pretorius
{"title":"Managing inter-departmental project delivery to enhance customer satisfaction","authors":"Sandiso Cosa, E. Ogbeifun, J. Pretorius","doi":"10.2478/emj-2021-0030","DOIUrl":null,"url":null,"abstract":"Abstract The National Department of Public Works and Infrastructure (NDPWI), an agency for infrastructure development in South Africa, provides accommodation and other infrastructure to various public service departments. Each department communicates its infrastructure requirements with the NDPWI. However, there are usually time lags between project briefing and the actual delivery of the infrastructure. Therefore, this article aims to explore the causes of delays and offer solutions to enhance customer satisfaction. The case study method of qualitative research was adopted. Data were collected from the NDPWI regional offices in Bloemfontein, Cape Town and Kimberley, and the professional service department at the head office in Pretoria, among purposively selected participants not below the deputy director level. The Delphi technique was used as an instrument for data collection and complemented during a focus group session. The findings revealed that the major factors contributing to delays included poor planning by the project execution team (PET), ineffective project monitoring and overcentralisation of the decision-making process. The findings, conclusions and recommendations of this research provide useful information for organisational restructuring, the training and continuous retraining of project personnel, especially the project managers. These steps hold the potential for ameliorating the negative effects of delay in the execution of construction projects by the NDPWI.","PeriodicalId":37237,"journal":{"name":"Engineering Management in Production and Services","volume":"13 1","pages":"39 - 56"},"PeriodicalIF":0.0000,"publicationDate":"2021-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Engineering Management in Production and Services","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2478/emj-2021-0030","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"Engineering","Score":null,"Total":0}
引用次数: 0

Abstract

Abstract The National Department of Public Works and Infrastructure (NDPWI), an agency for infrastructure development in South Africa, provides accommodation and other infrastructure to various public service departments. Each department communicates its infrastructure requirements with the NDPWI. However, there are usually time lags between project briefing and the actual delivery of the infrastructure. Therefore, this article aims to explore the causes of delays and offer solutions to enhance customer satisfaction. The case study method of qualitative research was adopted. Data were collected from the NDPWI regional offices in Bloemfontein, Cape Town and Kimberley, and the professional service department at the head office in Pretoria, among purposively selected participants not below the deputy director level. The Delphi technique was used as an instrument for data collection and complemented during a focus group session. The findings revealed that the major factors contributing to delays included poor planning by the project execution team (PET), ineffective project monitoring and overcentralisation of the decision-making process. The findings, conclusions and recommendations of this research provide useful information for organisational restructuring, the training and continuous retraining of project personnel, especially the project managers. These steps hold the potential for ameliorating the negative effects of delay in the execution of construction projects by the NDPWI.
管理跨部门项目交付以提高客户满意度
摘要国家公共工程和基础设施部(NDPWI)是南非的一个基础设施发展机构,为各个公共服务部门提供住宿和其他基础设施。各部门将其基础设施需求与NDPWI进行沟通。然而,项目简报和基础设施的实际交付之间通常存在时间滞后。因此,本文旨在探讨延迟的原因,并提出提高客户满意度的解决方案。采用定性研究的案例研究方法。数据是从NDPWI位于布隆方丹、开普敦和金伯利的区域办事处以及比勒陀利亚总部的专业服务部门收集的,这些部门是有意挑选的不低于副主任级别的参与者。德尔菲技术被用作数据收集工具,并在焦点小组会议期间得到补充。调查结果显示,造成延误的主要因素包括项目执行团队规划不力、项目监督不力以及决策过程过于集中。本研究的发现、结论和建议为组织重组、项目人员(尤其是项目经理)的培训和持续再培训提供了有用的信息。这些措施有可能改善NDPWI延迟执行建设项目的负面影响。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
Engineering Management in Production and Services
Engineering Management in Production and Services Business, Management and Accounting-Management Information Systems
CiteScore
3.40
自引率
0.00%
发文量
27
审稿时长
7 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信