Analysis of Critical Activity in the Hydromechanical Component Fabrication Project for Dam “X” using the Critical Path Method

OPSI Pub Date : 2023-06-19 DOI:10.31315/opsi.v16i1.9144
Pramudi Arsiwi, T. Talitha, Dony Satriyo Nugroho, Maharsa Pradityatama
{"title":"Analysis of Critical Activity in the Hydromechanical Component Fabrication Project for Dam “X” using the Critical Path Method","authors":"Pramudi Arsiwi, T. Talitha, Dony Satriyo Nugroho, Maharsa Pradityatama","doi":"10.31315/opsi.v16i1.9144","DOIUrl":null,"url":null,"abstract":"One of the projects currently being undertaken by PT. XYZ is Dam “X”. Based on project management data obtained from PT. XYZ, the actual project construction process experienced a significant delay from the planned schedule, with a delay duration of approximately 30 days. The delay will have an impact on the duration of the final completion of the project, including the process of delivering project results to consumers. The purpose of this study is to determine the critical path in project implementation and identify activities that do not have slack time because it will affect the duration of the overall project completion. The method used in this study is the Critical Path Method (CPM), which is a network method consisting of a series of activity components with the longest total time and showing the fastest duration of project completion. The results showed that the Manufacturing Project has a total of 11 critical activities out of 37 activities (work packages), with a total critical time of 75 days. The total critical time from the calculation of the CPM method also shows the optimal total project duration which can be used as a reference for the project team for the completion of a fabrication project or a hydromechanical component installation project on Dam \"X\".","PeriodicalId":34167,"journal":{"name":"OPSI","volume":" ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2023-06-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"OPSI","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.31315/opsi.v16i1.9144","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

One of the projects currently being undertaken by PT. XYZ is Dam “X”. Based on project management data obtained from PT. XYZ, the actual project construction process experienced a significant delay from the planned schedule, with a delay duration of approximately 30 days. The delay will have an impact on the duration of the final completion of the project, including the process of delivering project results to consumers. The purpose of this study is to determine the critical path in project implementation and identify activities that do not have slack time because it will affect the duration of the overall project completion. The method used in this study is the Critical Path Method (CPM), which is a network method consisting of a series of activity components with the longest total time and showing the fastest duration of project completion. The results showed that the Manufacturing Project has a total of 11 critical activities out of 37 activities (work packages), with a total critical time of 75 days. The total critical time from the calculation of the CPM method also shows the optimal total project duration which can be used as a reference for the project team for the completion of a fabrication project or a hydromechanical component installation project on Dam "X".
用临界路径法分析“X”坝水力机械构件制造项目中的临界活动
PT.XXYZ目前正在进行的项目之一是水坝“X”。根据从PT.XYZ获得的项目管理数据,实际项目施工过程比计划进度有很大延迟,延迟时间约为30天。延迟将影响项目最终完成的持续时间,包括向消费者交付项目成果的过程。本研究的目的是确定项目实施中的关键路径,并确定没有空闲时间的活动,因为这将影响整个项目完成的持续时间。本研究中使用的方法是关键路径法(CPM),这是一种由一系列总时间最长、项目完成持续时间最快的活动组成的网络方法。结果显示,制造项目在37项活动(工作包)中共有11项关键活动,总关键时间为75天。CPM方法计算得出的总关键时间也显示了最佳总项目工期,可作为项目团队完成“X”大坝制造项目或液压机械部件安装项目的参考。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
16
审稿时长
12 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信