{"title":"Analysis of Tunnel Ventilation During Tunnelling - A Case Study","authors":"K. Słota, Z. Słota","doi":"10.2478/ceer-2022-0056","DOIUrl":null,"url":null,"abstract":"Abstract In the case of tunnelling by mining methods, mining regulations apply to the design of ventilation. The most important criteria to be taken into account when calculating the minimum air flow rate in a tunnel are the air velocity, the multiple exchange of air during one hour, not exceeding the permissible concentrations of gases and dust, and ensuring appropriate climatic conditions. In this paper, an analysis of ventilation methods is carried out, taking into account the parameters of fans and ventilation ducts. Changing the diameter of the duct line from 1,000 to 1,400 mm results in a 3-4-fold reduction in fan power. Adding a second twin installation reduces the ventilation power requirement fourfold. Making the duct lines parallel increases the ventilation power requirement by about 30-50% compared to two duct installations.","PeriodicalId":54121,"journal":{"name":"Civil and Environmental Engineering Reports","volume":"32 1","pages":"259 - 269"},"PeriodicalIF":0.6000,"publicationDate":"2022-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Civil and Environmental Engineering Reports","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2478/ceer-2022-0056","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, CIVIL","Score":null,"Total":0}
引用次数: 0

Abstract

Abstract In the case of tunnelling by mining methods, mining regulations apply to the design of ventilation. The most important criteria to be taken into account when calculating the minimum air flow rate in a tunnel are the air velocity, the multiple exchange of air during one hour, not exceeding the permissible concentrations of gases and dust, and ensuring appropriate climatic conditions. In this paper, an analysis of ventilation methods is carried out, taking into account the parameters of fans and ventilation ducts. Changing the diameter of the duct line from 1,000 to 1,400 mm results in a 3-4-fold reduction in fan power. Adding a second twin installation reduces the ventilation power requirement fourfold. Making the duct lines parallel increases the ventilation power requirement by about 30-50% compared to two duct installations.
隧道施工过程中的隧道通风分析——以某隧道为例
摘要在采用采矿方法进行隧道掘进的情况下,矿井的通风设计适用采矿法规。在计算隧道内的最小空气流速时,最重要的考虑标准是空气流速,一小时内多次空气交换,不超过允许的气体和粉尘浓度,并确保适当的气候条件。本文在考虑风机和通风管道参数的情况下,对通风方式进行了分析。将管道线的直径从1,000 mm改为1,400 mm,可使风扇功率降低3-4倍。增加第二个双通道安装可减少四分之一的通风功率需求。与两个管道安装相比,使管道平行增加通风功率需求约30-50%。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
14.30%
发文量
40
审稿时长
52 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信