Improved reliability in planning large-scale infrastructure project delivery through Alliancing

IF 2.3 4区 管理学 Q3 BUSINESS
D. Walker, Paulo Vaz Serra, P. Love
{"title":"Improved reliability in planning large-scale infrastructure project delivery through Alliancing","authors":"D. Walker, Paulo Vaz Serra, P. Love","doi":"10.1108/ijmpb-02-2022-0035","DOIUrl":null,"url":null,"abstract":"PurposePrice reliability for complex and highly complicated infrastructure projects is problematic. Traditional project delivery approaches generally fail in achieving targeted end cost reliability. However, integrated project delivery (and particularly Alliancing), develop a far more reliable and robust project delivery plan and outturn time-cost targets. This paper aims to explore why this may be the case.Design/methodology/approachThis case study investigated the project design, planning, cost/time estimation approach and how risk/uncertainty was dealt with. Five senior project delivery experts from an organisation that delivers multi-billion-dollar infrastructure projects in Australia were interviewed. These five experts collectively had 100+ cross-disciplinary experience years delivering complex infrastructure projects.FindingsAlliancing adopts a radically different approach to project design, time/cost planning and risk assessment and management to traditional project delivery approaches. Key findings explain how the project alliance agreement designs-in processes that maximises team integration and collaboration. Analysis concludes that design thinking is used to craft and shape collaborative behaviours and project governance. Additionally, including project owner and facilities operator representatives in the project team adds valuable insights, expertise and knowledge contributing to planning reliability.Research limitations/implicationsThis study is exploratory and focussed on complex infrastructure projects so findings cannot be generalised.Practical implicationsWe unpack Alliancing processes that develop the target outturn cost plan, comprising a holistic and realistic plan to design a project to meet expected project outcomes. This case study may serve as an exemplar for complex project delivery.Social implicationsThis paper illustrates how Alliancing more effectively delivers best value than traditional procurement approaches through its TOC-TAE processes.Originality/valueThe paper contributes to the scant existing academic literature analysing these processes. Its novel contribution is explaining how Alliancing treats unexpected events that in traditional delivery forms trigger expensive and time-energy-wasting disputation. This case study may serve as an exemplar for complex project delivery.","PeriodicalId":47374,"journal":{"name":"International Journal of Managing Projects in Business","volume":null,"pages":null},"PeriodicalIF":2.3000,"publicationDate":"2022-06-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"5","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Managing Projects in Business","FirstCategoryId":"91","ListUrlMain":"https://doi.org/10.1108/ijmpb-02-2022-0035","RegionNum":4,"RegionCategory":"管理学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"BUSINESS","Score":null,"Total":0}
引用次数: 5

Abstract

PurposePrice reliability for complex and highly complicated infrastructure projects is problematic. Traditional project delivery approaches generally fail in achieving targeted end cost reliability. However, integrated project delivery (and particularly Alliancing), develop a far more reliable and robust project delivery plan and outturn time-cost targets. This paper aims to explore why this may be the case.Design/methodology/approachThis case study investigated the project design, planning, cost/time estimation approach and how risk/uncertainty was dealt with. Five senior project delivery experts from an organisation that delivers multi-billion-dollar infrastructure projects in Australia were interviewed. These five experts collectively had 100+ cross-disciplinary experience years delivering complex infrastructure projects.FindingsAlliancing adopts a radically different approach to project design, time/cost planning and risk assessment and management to traditional project delivery approaches. Key findings explain how the project alliance agreement designs-in processes that maximises team integration and collaboration. Analysis concludes that design thinking is used to craft and shape collaborative behaviours and project governance. Additionally, including project owner and facilities operator representatives in the project team adds valuable insights, expertise and knowledge contributing to planning reliability.Research limitations/implicationsThis study is exploratory and focussed on complex infrastructure projects so findings cannot be generalised.Practical implicationsWe unpack Alliancing processes that develop the target outturn cost plan, comprising a holistic and realistic plan to design a project to meet expected project outcomes. This case study may serve as an exemplar for complex project delivery.Social implicationsThis paper illustrates how Alliancing more effectively delivers best value than traditional procurement approaches through its TOC-TAE processes.Originality/valueThe paper contributes to the scant existing academic literature analysing these processes. Its novel contribution is explaining how Alliancing treats unexpected events that in traditional delivery forms trigger expensive and time-energy-wasting disputation. This case study may serve as an exemplar for complex project delivery.
通过联盟提高了大型基础设施项目交付规划的可靠性
目的复杂和高度复杂的基础设施项目的价格可靠性存在问题。传统的项目交付方法通常无法实现目标的最终成本可靠性。然而,集成的项目交付(特别是联盟),开发了一个更加可靠和健壮的项目交付计划和产出时间成本目标。本文旨在探讨为什么会出现这种情况。设计/方法论/方法本案例研究调查了项目设计、规划、成本/时间估算方法以及如何处理风险/不确定性。我们采访了来自澳大利亚一家提供数十亿美元基础设施项目的组织的五名高级项目交付专家。这五位专家总共有100多年的跨学科经验,交付了复杂的基础设施项目。与传统的项目交付方法相比,salliancing在项目设计、时间/成本计划、风险评估和管理方面采用了截然不同的方法。主要发现解释了项目联盟协议如何设计最大化团队整合和协作的流程。分析得出的结论是,设计思维用于设计和塑造协作行为和项目治理。此外,在项目团队中包括项目所有者和设施运营商代表,可以增加宝贵的见解、专业知识和知识,有助于提高规划的可靠性。研究局限/影响本研究是探索性的,主要针对复杂的基础设施项目,因此研究结果不能一概推广。实际意义我们分析了制定目标产出成本计划的联盟过程,包括一个整体和现实的计划来设计一个项目,以满足预期的项目成果。这个案例研究可以作为复杂项目交付的范例。社会意义本文阐述了联盟如何通过其TOC-TAE流程比传统采购方法更有效地提供最佳价值。原创性/价值本文对分析这些过程的现有学术文献有所贡献。它的新颖贡献在于解释了联盟如何处理意外事件,这些意外事件在传统交付形式中会引发昂贵且浪费时间的争论。这个案例研究可以作为复杂项目交付的范例。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
CiteScore
7.00
自引率
14.80%
发文量
45
期刊介绍: The International Journal of Managing Projects in Business seeks to advance the theory, research and practice of all aspects of project management. IJMPB is looking for top quality theoretical and empirical research with the aims of: promoting the understanding of project management and; encouraging the publication of novel project management insights using multidisciplinary approaches rooted in social sciences. The journal provides a much-needed resource involved in project management by exploring new avenues not often addressed in the field of project management.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信