Discontinuance of Lower Neuadd Reservoir

Q4 Earth and Planetary Sciences
D. Neeve, V. Stoyanova, B. Cotter, J. Clewer
{"title":"Discontinuance of Lower Neuadd Reservoir","authors":"D. Neeve, V. Stoyanova, B. Cotter, J. Clewer","doi":"10.1680/jdare.22.00086","DOIUrl":null,"url":null,"abstract":"Lower Neuadd Reservoir was created by an embankment dam constructed in 1884 in what has since become the Brecon Beacons National Park. The dam and spillway have exhibited a long history of concerns surrounding their integrity. The deteriorating spillway channel, faulty scour valve, and the leakage through the core with associated settlement of the embankment dam reached a point where remediation was not reasonably practical. The chosen solution was discontinuance by excavating a notch through the embankment dam. Obtaining permission to alter listed structures within a national park required detailed environmental assessments and negotiation with the authorities. Construction was complicated by a mountainous catchment that created significant flows at low return periods that could fill the empty reservoir basin in hours and overtop the works.","PeriodicalId":39070,"journal":{"name":"Dams and Reservoirs","volume":" ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-10-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Dams and Reservoirs","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1680/jdare.22.00086","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"Earth and Planetary Sciences","Score":null,"Total":0}
引用次数: 0

Abstract

Lower Neuadd Reservoir was created by an embankment dam constructed in 1884 in what has since become the Brecon Beacons National Park. The dam and spillway have exhibited a long history of concerns surrounding their integrity. The deteriorating spillway channel, faulty scour valve, and the leakage through the core with associated settlement of the embankment dam reached a point where remediation was not reasonably practical. The chosen solution was discontinuance by excavating a notch through the embankment dam. Obtaining permission to alter listed structures within a national park required detailed environmental assessments and negotiation with the authorities. Construction was complicated by a mountainous catchment that created significant flows at low return periods that could fill the empty reservoir basin in hours and overtop the works.
下纽阿德水库停产
Lower Neuadd水库是由1884年在布雷肯灯塔国家公园建造的堤坝建造的。大坝和溢洪道的完整性问题由来已久。泄洪道的恶化、冲刷阀的故障以及通过堆芯的泄漏以及堤坝的相关沉降,已经到了修复不可行的地步。选择的解决方案是通过在堤坝上挖掘一个缺口来中断。要获得更改国家公园内列出的结构的许可,需要进行详细的环境评估并与当局协商。由于山区集水区在低重现期产生大量流量,可能在数小时内填满空的水库流域,并淹没工程,施工变得复杂。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
Dams and Reservoirs
Dams and Reservoirs Earth and Planetary Sciences-Geotechnical Engineering and Engineering Geology
CiteScore
0.50
自引率
0.00%
发文量
30
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信