ENERGY AND COSTS SAVING AIR CONDITIONING SYSTEM OF SHOPPING MALL BUILDINGS: A CASE STUDY IN JAKARTA

A. Marjianto, Haftirman Haftirman
{"title":"ENERGY AND COSTS SAVING AIR CONDITIONING SYSTEM OF SHOPPING MALL BUILDINGS: A CASE STUDY IN JAKARTA","authors":"A. Marjianto, Haftirman Haftirman","doi":"10.22441/ijimeam.v3i3.11857","DOIUrl":null,"url":null,"abstract":"The air conditioning system for the Mall A building in Jakarta uses a central air conditioning system with a constant flow chiller with TES (Thermal Energy Storage). This system will be verified by measuring data regarding cooling load of the Mall A. The peak cooling load measurement results is 12,299 kW with a total cooling load of 45,733,180 kWh for 1 year. The result of the measurement data will be compared to cooling load calculation by Trace 700 software. Based on Trace 700 software, the peak cooling load is 12,594 kW with a total cooling load of 44,617,405 kWh. Furthermore, using the actual measurement data of the air conditioning system in Mall A, it will be compared with a central air conditioning system with a magnetic bearing chiller which will be equipped with VSD (Variable Speed Drive) to find out how well its energy performance and costs are for a mall building similar to Mall A, as a potential for energy and cost savings. The results of energy calculations and cost analysis, the central air conditioning system with the magnetic bearing chiller is 99 kWh/(m2.year) and the life cycle costs for 20 years, 30 years, and 50 years are 339,828,248,242 IDR, 415,994,136,400 IDR, 521,915,598,761 IDR. While the results of energy calculations and cost analysis, the TES combination constant flow chiller central air conditioning system is 141 kWh/(m2.year) and the life cycle costs for 20 years, 30 years, and 50 years are 435,150,140,059 IDR, 541,700,386,487 IDR, 690,535,151,478 IDR. Based on the foregoing, the central air conditioning system with variable flow magnetic bearing chiller is a better system than the central air conditioning system with TES combination constant flow chiller for shopping mall buildings similar to Mall A.","PeriodicalId":31435,"journal":{"name":"International Journal of Innovation in Mechanical Engineering and Advanced Materials","volume":" ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-02-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Innovation in Mechanical Engineering and Advanced Materials","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.22441/ijimeam.v3i3.11857","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The air conditioning system for the Mall A building in Jakarta uses a central air conditioning system with a constant flow chiller with TES (Thermal Energy Storage). This system will be verified by measuring data regarding cooling load of the Mall A. The peak cooling load measurement results is 12,299 kW with a total cooling load of 45,733,180 kWh for 1 year. The result of the measurement data will be compared to cooling load calculation by Trace 700 software. Based on Trace 700 software, the peak cooling load is 12,594 kW with a total cooling load of 44,617,405 kWh. Furthermore, using the actual measurement data of the air conditioning system in Mall A, it will be compared with a central air conditioning system with a magnetic bearing chiller which will be equipped with VSD (Variable Speed Drive) to find out how well its energy performance and costs are for a mall building similar to Mall A, as a potential for energy and cost savings. The results of energy calculations and cost analysis, the central air conditioning system with the magnetic bearing chiller is 99 kWh/(m2.year) and the life cycle costs for 20 years, 30 years, and 50 years are 339,828,248,242 IDR, 415,994,136,400 IDR, 521,915,598,761 IDR. While the results of energy calculations and cost analysis, the TES combination constant flow chiller central air conditioning system is 141 kWh/(m2.year) and the life cycle costs for 20 years, 30 years, and 50 years are 435,150,140,059 IDR, 541,700,386,487 IDR, 690,535,151,478 IDR. Based on the foregoing, the central air conditioning system with variable flow magnetic bearing chiller is a better system than the central air conditioning system with TES combination constant flow chiller for shopping mall buildings similar to Mall A.
购物中心建筑节能降耗空调系统&以雅加达为例
雅加达购物中心A大楼的空调系统采用中央空调系统,配有带TES(热能储存)的恒流冷水机。该系统将通过商场A的冷负荷测量数据进行验证。峰值冷负荷测量结果为12299 kW,一年的总冷负荷为45733180 kWh。测量数据的结果将与Trace 700软件的冷却负荷计算结果进行比较。根据Trace 700软件,峰值冷却负荷为12594 kW,总冷却负荷为44617405 kWh。此外,利用A商场空调系统的实际测量数据,将其与配备有VSD(变速驱动)的磁力轴承制冷机的中央空调系统进行比较,以了解其能源性能和成本对于类似于A商场的商场建筑来说有多好,这是节约能源和成本的潜力。根据能量计算和成本分析结果,带磁力轴承冷却器的中央空调系统为99 kWh/(m2.年),20年、30年和50年的生命周期成本分别为339828248242 IDR、415994136400 IDR和521915598761 IDR。根据能源计算和成本分析的结果,TES组合恒流冷水机组中央空调系统为141 kWh/(m2.年),20年、30年和50年的生命周期成本分别为435150140059 IDR、541700386487 IDR和690535151478 IDR。基于以上所述,对于类似于购物中心a的购物中心建筑,采用变流量磁力轴承制冷机的中央空调系统是比采用TES组合恒流制冷机的中心空调系统更好的系统。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
6
审稿时长
4 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信
小红书