The concept of the extension of the railway overpass in the central part of WWK

M. Kruszyna, J. Makuch
{"title":"The concept of the extension of the railway overpass in the central part of WWK","authors":"M. Kruszyna, J. Makuch","doi":"10.35117/a_eng_21_08_02","DOIUrl":null,"url":null,"abstract":"Abstract: The Wrocław Railway Node (WWK) was briefly characterized in the introduction to the paper. The attention to the need to increase the level of rail use in servicing city traffic in Wrocław was drawn too. Reference was made to the original proposals of the agglomeration railway system for Wrocław. The scope of necessary investment and non-investment activities was analyzed in order to increase the capacity of the cross-city railway route and the adjacent routes. It was proposed to build the fourth track on the south side of the overpass of Wrocław railway diameter and new stops \"Świdnicka\" and \"Grabiszyńska\". In the conclusion, the need to create a second railway tunnel diameter in the longer term was signaled. Keywords: Agglomeration railway; Cross-city route; Railway overpass; WWK (Wrocław Railway Node)","PeriodicalId":52762,"journal":{"name":"Przeglad Komunikacyjny","volume":" ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2021-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Przeglad Komunikacyjny","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.35117/a_eng_21_08_02","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Abstract: The Wrocław Railway Node (WWK) was briefly characterized in the introduction to the paper. The attention to the need to increase the level of rail use in servicing city traffic in Wrocław was drawn too. Reference was made to the original proposals of the agglomeration railway system for Wrocław. The scope of necessary investment and non-investment activities was analyzed in order to increase the capacity of the cross-city railway route and the adjacent routes. It was proposed to build the fourth track on the south side of the overpass of Wrocław railway diameter and new stops "Świdnicka" and "Grabiszyńska". In the conclusion, the need to create a second railway tunnel diameter in the longer term was signaled. Keywords: Agglomeration railway; Cross-city route; Railway overpass; WWK (Wrocław Railway Node)
中环铁路立交桥延伸部分的概念
摘要:本文在引言部分对Wrocław铁路节点(WWK)进行了简要描述。与会者还提请注意需要增加为Wrocław的城市交通服务的铁路使用水平。参考了Wrocław集聚铁路系统的原始建议。为提高跨城铁路及相邻线路的运力,分析了必要投资和非投资活动的范围。建议在Wrocław铁路直径立交桥南侧修建第四条轨道,并新建“Świdnicka”和“Grabiszyńska”站。在结论中,需要在较长时间内建立第二个铁路隧道直径。关键词:集聚铁路;但是路线;铁路立交桥;WWK (Wrocław铁路节点)
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
审稿时长
5 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信