{"title":"EVALUASI INSTALASI LISTRIK PADA GEDUNG MULTI CENTRE OF EXCELLENT (MCE) RUMAH SAKIT ISLAM SULTAN AGUNG SEMARANG","authors":"Eko Wahyu Pramon, K. Karnoto, Titik Nurhayati","doi":"10.26623/elektrika.v9i1.1110","DOIUrl":null,"url":null,"abstract":" MCE Building Sultan Agung Islamic Hospital Semarang is a public facility that requires an electrical installation system that is in accordance with PUIL 2000. The purpose of evaluating electrical installations at the Multi Center of Excellent (MCE) building in Sultan Agung Semarang Islamic Hospital is to find out electrical installations in accordance with PUIL 2000 Evaluation of electrical installations includes calculation of MCB security and calculation of cable size. Calculation using manual calculation method and calculation using Ecodial Calculation 4.7 software. The calculation results are then compared to the installed units. From the results of the comparison it can be seen whether the electrical installation is in accordance with PUIL 2000. The results of the analysis can be concluded that the electrical installation system in the MCE building of Sultan Agung Semarang Islamic Hospital is in good condition and safe. In MCB installed units, they are in accordance with the PUIL 2000 standard. In the cable sizes installed several are in a condition not in accordance with the PUIL 2000 standard so cable replacement is required. For example, on the 1st floor divider panel SDP cable where the installed cable is 4x35 mm2, it is replaced by 4x95 mm2.Keywords: Evaluation of Electrical Installation, PUIL 2000, Ecodial Advance Calculation 4","PeriodicalId":31998,"journal":{"name":"Elektrika","volume":" ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2018-12-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Elektrika","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.26623/elektrika.v9i1.1110","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

Abstract

 MCE Building Sultan Agung Islamic Hospital Semarang is a public facility that requires an electrical installation system that is in accordance with PUIL 2000. The purpose of evaluating electrical installations at the Multi Center of Excellent (MCE) building in Sultan Agung Semarang Islamic Hospital is to find out electrical installations in accordance with PUIL 2000 Evaluation of electrical installations includes calculation of MCB security and calculation of cable size. Calculation using manual calculation method and calculation using Ecodial Calculation 4.7 software. The calculation results are then compared to the installed units. From the results of the comparison it can be seen whether the electrical installation is in accordance with PUIL 2000. The results of the analysis can be concluded that the electrical installation system in the MCE building of Sultan Agung Semarang Islamic Hospital is in good condition and safe. In MCB installed units, they are in accordance with the PUIL 2000 standard. In the cable sizes installed several are in a condition not in accordance with the PUIL 2000 standard so cable replacement is required. For example, on the 1st floor divider panel SDP cable where the installed cable is 4x35 mm2, it is replaced by 4x95 mm2.Keywords: Evaluation of Electrical Installation, PUIL 2000, Ecodial Advance Calculation 4
三宝垄苏丹阿贡伊斯兰医院MCE大楼是一个公共设施,需要符合PUIL 2000的电气安装系统。评估苏丹阿贡-三宝垄伊斯兰医院卓越多中心(MCE)大楼的电气装置的目的是根据PUIL 2000找出电气装置。电气装置评估包括MCB安全性计算和电缆尺寸计算。使用手动计算方法进行计算,使用Ecodial Calculation 4.7软件进行计算。然后将计算结果与安装的机组进行比较。从比较结果可以看出,电气装置是否符合PUIL 2000。分析结果表明,苏丹阿贡三宝垄伊斯兰医院MCE大楼的电气安装系统状况良好,安全可靠。在MCB安装单元中,它们符合PUIL 2000标准。在安装的电缆尺寸中,有几个处于不符合PUIL 2000标准的状态,因此需要更换电缆。例如,在一楼分隔板SDP电缆上,安装的电缆为4x35 mm2,将其替换为4x95 mm2。关键词:电气安装评估,PUIL 2000,Ecodial Advance Calculation 4
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
12
审稿时长
24 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信