Risk resources management influence on public–private partnership risk management in construction industry. Confirmatory factor analysis approach

IF 2.6 Q1 ENGINEERING, MULTIDISCIPLINARY
Timothy Adu Gyamfi, C. Aigbavboa, W. Thwala
{"title":"Risk resources management influence on public–private partnership risk management in construction industry. Confirmatory factor analysis approach","authors":"Timothy Adu Gyamfi, C. Aigbavboa, W. Thwala","doi":"10.1108/jedt-12-2021-0699","DOIUrl":null,"url":null,"abstract":"\nPurpose\nConstruction organisations cannot underestimate the improvement in public–private partnership (PPP) projects’ implementation. At the same time, construction organisations cannot overlook the risk arising from engaging in PPP construction projects. Hence, this study aims to establish the influence of risk resource management (RRM) in managing PPP risk in the construction industry in Ghana.\n\n\nDesign/methodology/approach\nThe researchers adopted qualitative and quantitative research methods to achieve the aim of the study, in which Delphi questions and a close-ended questionnaire were developed. A total of 650 construction specialists, including procurement officers, consultants, project managers, quantity surveyors, site engineers and planning officers were chosen using random and purposive sampling techniques. Recovered data were analysed using descriptive statistics and confirmatory factor analysis (CFA). The CFA maximum likelihood estimation extractor compresses 19 variables into 3 pattern matrices.\n\n\nFindings\nThe results of the study revealed three factors that measure RRM in Ghana’s PPP construction industry, including financial resource management which was influenced by communicating the budget to project team members and project partners understanding the budget, and material resource management which was influenced by the provision of materials transportation and provision of delivery programs and labour resource management which was impacted by a commitment to pay social security and taxes and provision of good salaries, to address RRM in PPP construction organisations.\n\n\nResearch limitations/implications\nTo incessantly improve the PPP risk management (RM) in construction through RRM, there should be a strong liaison between the universities, government agencies and the construction industry, and such collaboration will assist the industry to obtain first-hand information regarding the study findings and how they can be implemented to help the development of RM in the construction industry. This study is limited to Ghana and CFA and further study should explore structural equation model to determine the structure and measurement model of the risk resource variables.\n\n\nOriginality/value\nThe study may be valuable to industry stakeholders looking for new approaches to improve RM in their construction activities, particularly in PPP projects. Also, to assist reduce PPP risk, construction companies should use RRM in their organisations.\n","PeriodicalId":46533,"journal":{"name":"Journal of Engineering Design and Technology","volume":" ","pages":""},"PeriodicalIF":2.6000,"publicationDate":"2022-12-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Engineering Design and Technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1108/jedt-12-2021-0699","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"ENGINEERING, MULTIDISCIPLINARY","Score":null,"Total":0}
引用次数: 1

Abstract

Purpose Construction organisations cannot underestimate the improvement in public–private partnership (PPP) projects’ implementation. At the same time, construction organisations cannot overlook the risk arising from engaging in PPP construction projects. Hence, this study aims to establish the influence of risk resource management (RRM) in managing PPP risk in the construction industry in Ghana. Design/methodology/approach The researchers adopted qualitative and quantitative research methods to achieve the aim of the study, in which Delphi questions and a close-ended questionnaire were developed. A total of 650 construction specialists, including procurement officers, consultants, project managers, quantity surveyors, site engineers and planning officers were chosen using random and purposive sampling techniques. Recovered data were analysed using descriptive statistics and confirmatory factor analysis (CFA). The CFA maximum likelihood estimation extractor compresses 19 variables into 3 pattern matrices. Findings The results of the study revealed three factors that measure RRM in Ghana’s PPP construction industry, including financial resource management which was influenced by communicating the budget to project team members and project partners understanding the budget, and material resource management which was influenced by the provision of materials transportation and provision of delivery programs and labour resource management which was impacted by a commitment to pay social security and taxes and provision of good salaries, to address RRM in PPP construction organisations. Research limitations/implications To incessantly improve the PPP risk management (RM) in construction through RRM, there should be a strong liaison between the universities, government agencies and the construction industry, and such collaboration will assist the industry to obtain first-hand information regarding the study findings and how they can be implemented to help the development of RM in the construction industry. This study is limited to Ghana and CFA and further study should explore structural equation model to determine the structure and measurement model of the risk resource variables. Originality/value The study may be valuable to industry stakeholders looking for new approaches to improve RM in their construction activities, particularly in PPP projects. Also, to assist reduce PPP risk, construction companies should use RRM in their organisations.
风险资源管理对建筑业公私合作风险管理的影响。验证性因子分析法
建筑组织不能低估公私合作(PPP)项目实施的改善。与此同时,建筑机构也不能忽视参与PPP建设项目所带来的风险。因此,本研究旨在建立风险资源管理(RRM)在加纳建筑业PPP风险管理中的影响。设计/方法/方法为了达到研究目的,研究者采用了定性和定量的研究方法,其中设计了德尔菲问题和封闭式问卷。采用随机和有目的的抽样技术,共选出650名建筑专家,包括采购干事、顾问、项目经理、工料测量师、现场工程师和规划干事。恢复的数据采用描述性统计和验证性因子分析(CFA)进行分析。CFA最大似然估计提取器将19个变量压缩为3个模式矩阵。研究结果揭示了衡量加纳PPP建筑行业RRM的三个因素,包括财务资源管理,财务资源管理受向项目团队成员和项目合作伙伴传达预算和理解预算的影响;材料资源管理(受提供材料运输和提供交付计划的影响)和劳动力资源管理(受支付社会保障和税收的承诺以及提供良好工资的影响),以解决PPP建筑组织中的RRM问题。研究的局限/启示要通过风险管理不断改善建筑业的PPP风险管理,大学、政府机构和建造业之间应该有紧密的联系,这种合作将有助于业界获得有关研究结果的第一手资料,以及如何实施这些研究结果,以帮助建造业发展风险管理。本研究仅限于加纳和CFA,进一步研究应探索结构方程模型,确定风险资源变量的结构和测量模型。独创性/价值该研究可能对寻找新方法以改善建筑活动中的风险管理的行业利益相关者有价值,特别是在PPP项目中。此外,为了帮助降低PPP风险,建筑公司应该在其组织中使用RRM。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
Journal of Engineering Design and Technology
Journal of Engineering Design and Technology ENGINEERING, MULTIDISCIPLINARY-
CiteScore
6.50
自引率
21.40%
发文量
67
期刊介绍: - Design strategies - Usability and adaptability - Material, component and systems performance - Process control - Alternative and new technologies - Organizational, management and research issues - Human factors - Environmental, quality and health and safety issues - Cost and life cycle issues - Sustainability criteria, indicators, measurement and practices - Risk management - Entrepreneurship Law, regulation and governance - Design, implementing, managing and practicing innovation - Visualization, simulation, information and communication technologies - Education practices, innovation, strategies and policy issues.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信