Analisa Perencanaan Pembangkit Listrik Tenaga Surya Atap dengan Sistem Hybrid di PT. Koloni Timur

Noor Hajir Sudarjo, M. Haddin, Agus Suprajitno
{"title":"Analisa Perencanaan Pembangkit Listrik Tenaga Surya Atap dengan Sistem Hybrid di PT. Koloni Timur","authors":"Noor Hajir Sudarjo, M. Haddin, Agus Suprajitno","doi":"10.26623/elektrika.v14i1.3784","DOIUrl":null,"url":null,"abstract":"This study discusses the Planning of a Rooftop Solar Power Plant with a Hybrid System at PT East Colony Kudus. Themodel is set as a PLTS whose solar panels are adjusted to the roof area of the building. This PLTS is functioned as a newrenewable energy resource (EBT) in the form of a hybrid between PLTS and PLN's electrical energy source, this is done tohelp supply electricity. Parameters determined include: roof area, solar panel capacity, inverter capacity, battery capacityand payback period. The results show that PLTS with a total of 80 solar panels installed with a capacity of each panel 405Watt peak, then obtained a power capacity of 32.4 kilo Watt peak which is divided into 5 arrays, with a solar charger controllerand inverter using a 10kW capacity of 5 units, 80 batteries with a capacity of 400Ah. So that PLTS is able to contribute 39.3%of the total power needed by PT East Colony (electric power from PLN is 60.7%). This hybrid payback period will return after8 years and 7 months.","PeriodicalId":31998,"journal":{"name":"Elektrika","volume":" ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-04-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Elektrika","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.26623/elektrika.v14i1.3784","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

Abstract

This study discusses the Planning of a Rooftop Solar Power Plant with a Hybrid System at PT East Colony Kudus. Themodel is set as a PLTS whose solar panels are adjusted to the roof area of the building. This PLTS is functioned as a newrenewable energy resource (EBT) in the form of a hybrid between PLTS and PLN's electrical energy source, this is done tohelp supply electricity. Parameters determined include: roof area, solar panel capacity, inverter capacity, battery capacityand payback period. The results show that PLTS with a total of 80 solar panels installed with a capacity of each panel 405Watt peak, then obtained a power capacity of 32.4 kilo Watt peak which is divided into 5 arrays, with a solar charger controllerand inverter using a 10kW capacity of 5 units, 80 batteries with a capacity of 400Ah. So that PLTS is able to contribute 39.3%of the total power needed by PT East Colony (electric power from PLN is 60.7%). This hybrid payback period will return after8 years and 7 months.
屋顶太阳能发电厂与东部殖民地的混合系统进行规划分析
本研究讨论了PT East Colony Kudus屋顶太阳能发电厂的混合系统规划。模型被设置为PLTS,其太阳能电池板被调整到建筑物的屋顶区域。该PLTS作为一种新的可再生能源(EBT),以PLTS和印尼国家电力公司电能源的混合形式发挥作用,这有助于供电。确定的参数包括:屋顶面积、太阳能电池板容量、逆变器容量、电池容量和回收期。结果表明,PLTS共安装了80块太阳能电池板,每块电池板的峰值容量为405瓦,然后获得了32.4千瓦的峰值功率,分为5个阵列,太阳能充电器控制器和逆变器使用5个10kW的容量,80个400Ah的电池。因此,PLTS能够贡献PT East Colony所需总电力的39.3%(印尼国家电力公司的电力为60.7%)。该混合投资回收期将在8年零7个月后恢复。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
12
审稿时长
24 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信