{"title":"Usage and efficiency analysis of electricity generated by PV power plant in a marina or industrial facility","authors":"A. Dal","doi":"10.30521/jes.1054133","DOIUrl":null,"url":null,"abstract":"In this study, the analysis of the usage efficiency and the time allocation to cover the initial investment cost of a PV power plant to be installed in an industrial facility having constant electricity consumption monthly and a yacht marina having fluctuating electricity consumption in a year (equal yearly electricity in each in total) within the installation assumption of same conditions of PV plant has been done. The PV power plant data with 680 kWp power and located at the same latitude as the yacht marina in the center of Mediterranean were used. For this purpose, it has been calculated that the PV power plant installed power required for the annual electricity need of the yacht marina will be 1357 kWp. With this power, 2,141,117 kWh of electricity has been produced annually and the yacht marina/industrial facility need has been supplied. In addition, the Net Present Value (NPV) was used to calculate the coverage period for the initial investment cost of the PV plant. In the calculations, it has been determined that the time to cover the initial investment cost is 4.31 years in the yacht marina and 4.37 years in the industrial facility. This result showed that installing PV power plants in marinas would be 1.5% more advantageous than other industrial facilities.","PeriodicalId":52308,"journal":{"name":"Journal of Energy Systems","volume":" ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-09-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Energy Systems","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.30521/jes.1054133","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"Energy","Score":null,"Total":0}
引用次数: 0

Abstract

In this study, the analysis of the usage efficiency and the time allocation to cover the initial investment cost of a PV power plant to be installed in an industrial facility having constant electricity consumption monthly and a yacht marina having fluctuating electricity consumption in a year (equal yearly electricity in each in total) within the installation assumption of same conditions of PV plant has been done. The PV power plant data with 680 kWp power and located at the same latitude as the yacht marina in the center of Mediterranean were used. For this purpose, it has been calculated that the PV power plant installed power required for the annual electricity need of the yacht marina will be 1357 kWp. With this power, 2,141,117 kWh of electricity has been produced annually and the yacht marina/industrial facility need has been supplied. In addition, the Net Present Value (NPV) was used to calculate the coverage period for the initial investment cost of the PV plant. In the calculations, it has been determined that the time to cover the initial investment cost is 4.31 years in the yacht marina and 4.37 years in the industrial facility. This result showed that installing PV power plants in marinas would be 1.5% more advantageous than other industrial facilities.
码头或工业设施中光伏电站发电的使用和效率分析
在本研究中,在光伏电站相同条件的安装假设下,对一个月用电量不变的工业设施和一个年用电量波动的游艇码头安装光伏电站的使用效率和覆盖初始投资成本的时间分配进行了分析。采用与地中海中部游艇码头同纬度、功率为680 kWp的光伏电站数据。为此,经计算,游艇码头年用电需求所需的光伏电站装机功率为1357 kWp。利用这些电力,每年产生2,141,117千瓦时的电力,并满足游艇码头/工业设施的需求。此外,使用净现值(NPV)来计算光伏电站初始投资成本的覆盖期限。在计算中,确定游艇码头的初始投资成本为4.31年,工业设施的初始投资成本为4.37年。该结果表明,在码头安装光伏电站将比其他工业设施多出1.5%的优势。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
Journal of Energy Systems
Journal of Energy Systems Environmental Science-Management, Monitoring, Policy and Law
CiteScore
1.60
自引率
0.00%
发文量
29
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信