Production Planning and Engineering Process Improvement

N. Medhin, R. Uzsoy
{"title":"Production Planning and Engineering Process Improvement","authors":"N. Medhin, R. Uzsoy","doi":"10.46719/dsa20202922","DOIUrl":null,"url":null,"abstract":"The authors present an optimal control model to allocated equipment capacity between production that generates immediate revenue and engineering process improvement activity that results in increased future output. The benefit of engineering activity is modeled as a concave function of the total number of engineering lots processed to date, while the production facility is represented by a nonlinear clearing function capturing the nonlinear relationship between resource utilization and cycle time. We analyze the model to develop structural results and illustrates its behavior with numerical experiments.","PeriodicalId":92887,"journal":{"name":"Communications in applied analysis","volume":"22 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2020-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Communications in applied analysis","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.46719/dsa20202922","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

The authors present an optimal control model to allocated equipment capacity between production that generates immediate revenue and engineering process improvement activity that results in increased future output. The benefit of engineering activity is modeled as a concave function of the total number of engineering lots processed to date, while the production facility is represented by a nonlinear clearing function capturing the nonlinear relationship between resource utilization and cycle time. We analyze the model to develop structural results and illustrates its behavior with numerical experiments.
生产计划和工程流程改进
作者提出了一个优化控制模型,在产生即时收入的生产和增加未来产量的工程过程改进活动之间分配设备容量。工程活动的效益被建模为迄今为止处理的工程批总数的凹函数,而生产设施则由捕捉资源利用率和循环时间之间非线性关系的非线性清除函数表示。我们分析了该模型以发展结构结果,并通过数值实验说明了其行为。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信