Dynamics of Pertinent Project Delay Variables in the Thai Construction Sector: Mathematical Analysis

Q2 Engineering
B. Ajayi, T. Chinda
{"title":"Dynamics of Pertinent Project Delay Variables in the Thai Construction Sector: Mathematical Analysis","authors":"B. Ajayi, T. Chinda","doi":"10.2478/emj-2022-0014","DOIUrl":null,"url":null,"abstract":"Abstract Project completion behind schedule is a struggle for the construction sector, affecting time, cost, and quality. This investigation has been necessitated by the lingering nature of project delay risks despite many extant analyses. This study collated expert opinions from the Thai construction sector on salient construction delay variables and their influence on each other for DEMATEL-SD analysis. The collated data were analysed and found consistent with a Cronbach’s alpha of 0.939. Then, the DEMATEL technique was used to establish the influence weight of factors for the System dynamics (SD) analysis. It was discovered that minimising the design error at the preconstruction stage significantly reduces the magnitude of delay. Increasing values of design error and change order increase the rework profile. Besides, the project delivery within the scheduled 232 weeks can be ensured by minimising the threat of design error, design change, change order, rework, productivity problem, and by improving project management. This study adopted a hybrid mathematical system to holistically examine the construction delay risk by comprehensively exploring the dynamics of influencing variables and investigating their impact on the project scheme. The system helps project stakeholders to arrive at an effective decision in overcoming delay risks, thus minimising the cost overrun and improving the project quality.","PeriodicalId":37237,"journal":{"name":"Engineering Management in Production and Services","volume":"14 1","pages":"26 - 45"},"PeriodicalIF":0.0000,"publicationDate":"2022-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Engineering Management in Production and Services","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2478/emj-2022-0014","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"Engineering","Score":null,"Total":0}
引用次数: 1

Abstract

Abstract Project completion behind schedule is a struggle for the construction sector, affecting time, cost, and quality. This investigation has been necessitated by the lingering nature of project delay risks despite many extant analyses. This study collated expert opinions from the Thai construction sector on salient construction delay variables and their influence on each other for DEMATEL-SD analysis. The collated data were analysed and found consistent with a Cronbach’s alpha of 0.939. Then, the DEMATEL technique was used to establish the influence weight of factors for the System dynamics (SD) analysis. It was discovered that minimising the design error at the preconstruction stage significantly reduces the magnitude of delay. Increasing values of design error and change order increase the rework profile. Besides, the project delivery within the scheduled 232 weeks can be ensured by minimising the threat of design error, design change, change order, rework, productivity problem, and by improving project management. This study adopted a hybrid mathematical system to holistically examine the construction delay risk by comprehensively exploring the dynamics of influencing variables and investigating their impact on the project scheme. The system helps project stakeholders to arrive at an effective decision in overcoming delay risks, thus minimising the cost overrun and improving the project quality.
泰国建筑业相关项目延误变量的动态:数学分析
摘要工程进度落后是建筑业的一场斗争,影响时间、成本和质量。尽管有许多现存的分析,但由于项目延误风险的持续性,这项调查是必要的。本研究整理了泰国建筑部门关于显著施工延误变量及其相互影响的专家意见,用于DEMATEL-SD分析。对整理后的数据进行了分析,发现其与0.939的Cronbachα一致。然后,利用DEMATEL技术建立了系统动力学分析中各因素的影响权重。研究发现,在施工前阶段将设计误差降至最低可显著降低延误的幅度。增加设计误差和变更单的值会增加返工轮廓。此外,通过最大限度地减少设计错误、设计变更、变更单、返工、生产力问题的威胁,并通过改进项目管理,可以确保项目在计划的232周内交付。本研究采用混合数学系统,通过全面探索影响变量的动态,并调查其对项目方案的影响,全面考察施工延误风险。该系统帮助项目利益相关者在克服延误风险方面做出有效决策,从而最大限度地减少成本超支并提高项目质量。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
Engineering Management in Production and Services
Engineering Management in Production and Services Business, Management and Accounting-Management Information Systems
CiteScore
3.40
自引率
0.00%
发文量
27
审稿时长
7 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信