Interaction researching mental spaces of movable context, stakeholders, and project manager

IF 1.6 Q3 MANAGEMENT
O. Verenych, S. Bushuyev
{"title":"Interaction researching mental spaces of movable context, stakeholders, and project manager","authors":"O. Verenych, S. Bushuyev","doi":"10.1515/otmcj-2016-0021","DOIUrl":null,"url":null,"abstract":"Abstract As practice shows, the success of project implementation depends on the clear and integrated interaction between stakeholders, the project manager, and the movable context. Such an interaction exists on the level of mental spaces. If the mental spaces are congruent, in other words, all things are in the space of clear and univocal understanding of all aspects of the project, “are speaking the same language,” then project implementation is clear, exact, and in time. On practice, it is observed that full understanding is absent during project initialization and implementation and mental space cannot be congruent completely or is congruent partially. This situation exists during the implementation of the international projects, which involves working together with specialists from different countries. In this case, the project manager must organize interaction between different mental spaces. A research hypothesis consists of the assumption that the interaction between mental spaces of the movable context, stakeholders, and the project manager is carried out in a blended mental space. This space is temporary in relative to other mental spaces during the project life cycle; the project manager should manage this space through the usage of different skills. The research was carried out by scientific methods of theories of mental and blended spaces, and the theory of knowledge, i.e. theoretical and empirical research using project management approaches. The research’s results showed that organization of interaction in the blended mental space with using appropriate competencies of the project manager provides successful project implementation. The theoretical base of research is presented in the example of the implementation of one of the largest infrastructure projects in Ukraine: New Safe Confinement Construction.","PeriodicalId":42309,"journal":{"name":"Organization Technology and Management in Construction","volume":"10 1","pages":"1684 - 1695"},"PeriodicalIF":1.6000,"publicationDate":"2018-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Organization Technology and Management in Construction","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1515/otmcj-2016-0021","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"MANAGEMENT","Score":null,"Total":0}
引用次数: 4

Abstract

Abstract As practice shows, the success of project implementation depends on the clear and integrated interaction between stakeholders, the project manager, and the movable context. Such an interaction exists on the level of mental spaces. If the mental spaces are congruent, in other words, all things are in the space of clear and univocal understanding of all aspects of the project, “are speaking the same language,” then project implementation is clear, exact, and in time. On practice, it is observed that full understanding is absent during project initialization and implementation and mental space cannot be congruent completely or is congruent partially. This situation exists during the implementation of the international projects, which involves working together with specialists from different countries. In this case, the project manager must organize interaction between different mental spaces. A research hypothesis consists of the assumption that the interaction between mental spaces of the movable context, stakeholders, and the project manager is carried out in a blended mental space. This space is temporary in relative to other mental spaces during the project life cycle; the project manager should manage this space through the usage of different skills. The research was carried out by scientific methods of theories of mental and blended spaces, and the theory of knowledge, i.e. theoretical and empirical research using project management approaches. The research’s results showed that organization of interaction in the blended mental space with using appropriate competencies of the project manager provides successful project implementation. The theoretical base of research is presented in the example of the implementation of one of the largest infrastructure projects in Ukraine: New Safe Confinement Construction.
互动研究活动环境、利益相关者和项目经理的心理空间
摘要实践表明,项目实施的成功取决于利益相关者、项目经理和可移动环境之间清晰而完整的互动。这种互动存在于心理空间的层面上。如果心理空间是一致的,换句话说,所有的东西都在对项目的各个方面都有清晰和统一的理解的空间中,“说的是同一种语言”,那么项目的实施是清晰、准确和及时的。在实践中,观察到在项目初始化和实施过程中缺乏充分的理解,心理空间不能完全一致或部分一致。在国际项目的实施过程中存在这种情况,其中包括与不同国家的专家合作。在这种情况下,项目经理必须组织不同心理空间之间的互动。研究假设包括这样一种假设,即可移动上下文、利益相关者和项目经理的心理空间之间的互动是在一个混合的心理空间中进行的。相对于项目生命周期中的其他心理空间,这个空间是暂时的;项目经理应该通过使用不同的技能来管理这个空间。本研究采用了心理空间和混合空间理论的科学方法,以及知识理论,即使用项目管理方法进行的理论和实证研究。研究结果表明,在混合的心理空间中组织互动,并利用项目经理的适当能力,可以成功地实施项目。研究的理论基础以乌克兰最大的基础设施项目之一:新安全禁闭建设的实施为例。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
CiteScore
3.10
自引率
0.00%
发文量
8
审稿时长
16 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信