EVALUASI NON-PHYSICAL WASTE DENGAN LEAN CONSTRUCTION PADA PROYEK GEDUNG SANGGALA

Prokons Pub Date : 2020-08-31 DOI:10.33795/PROKONS.V14I2.268
Marselino Gamaliel Tamallo, Afrizal Nursin
{"title":"EVALUASI NON-PHYSICAL WASTE DENGAN LEAN CONSTRUCTION PADA PROYEK GEDUNG SANGGALA","authors":"Marselino Gamaliel Tamallo, Afrizal Nursin","doi":"10.33795/PROKONS.V14I2.268","DOIUrl":null,"url":null,"abstract":"The construction industry faces many challenges with problems related to construction waste as it takes up time and effort without adding value to clients. A concept in project management, namely lean construction, has the main focus of minimizing waste and providing added value to a construction project. The purpose of this study was to know the existence of non-physical waste, its causative factors, and how lean construction can be implemented to minimize non-physical waste in earthworks, foundations and basement 2 of the Sanggala Hotel and Office Building Project. The study was carried out by observation, document study, and questionnaires to identify non-physical waste. This study showed that the non-physical waste that most often occurs in related project was equipment breakdown frequently with a weight of 0.086. Meanwhile, the non-physical waste variable that has the greatest impact on causing time overrun on the project was delayed schedule with a weight of 0.080. Equipment breakdown frequently is influenced dominantly by the equipment shortage. Delayed schedule is influenced dominantly by licensing problems. In general, lean construction approaches such as Construction Meetings, Preventive And Predictive Maintenance, and Fail-Safe For Quality And Safety can be applied by contractors to minimize non-physical waste that was dominant in the project. Keywords: Lean Construction, Non-Physical Waste, Waste","PeriodicalId":34836,"journal":{"name":"Prokons","volume":"1 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2020-08-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Prokons","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.33795/PROKONS.V14I2.268","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

The construction industry faces many challenges with problems related to construction waste as it takes up time and effort without adding value to clients. A concept in project management, namely lean construction, has the main focus of minimizing waste and providing added value to a construction project. The purpose of this study was to know the existence of non-physical waste, its causative factors, and how lean construction can be implemented to minimize non-physical waste in earthworks, foundations and basement 2 of the Sanggala Hotel and Office Building Project. The study was carried out by observation, document study, and questionnaires to identify non-physical waste. This study showed that the non-physical waste that most often occurs in related project was equipment breakdown frequently with a weight of 0.086. Meanwhile, the non-physical waste variable that has the greatest impact on causing time overrun on the project was delayed schedule with a weight of 0.080. Equipment breakdown frequently is influenced dominantly by the equipment shortage. Delayed schedule is influenced dominantly by licensing problems. In general, lean construction approaches such as Construction Meetings, Preventive And Predictive Maintenance, and Fail-Safe For Quality And Safety can be applied by contractors to minimize non-physical waste that was dominant in the project. Keywords: Lean Construction, Non-Physical Waste, Waste
SANGLE项目建设的非实物支出评估
建筑业面临着许多与建筑垃圾有关的问题,因为这需要时间和精力,而不会为客户增加价值。项目管理中的一个概念,即精益施工,其主要重点是最大限度地减少浪费并为建设项目提供附加值。本研究的目的是了解桑加拉酒店和办公楼项目土方工程、地基和地下室2中非物理废物的存在及其原因,以及如何实施精益施工以最大限度地减少非物理废物。该研究通过观察、文献研究和问卷调查进行,以确定非物理废物。研究表明,在相关项目中最常见的非物理废物是设备故障,其重量为0.086。同时,对项目造成时间超支影响最大的非物理废物变量是延迟进度,权重为0.080。设备故障频发主要受设备短缺的影响。延迟的时间表主要受许可证问题的影响。一般来说,承包商可以采用精益施工方法,如施工会议、预防性和预测性维护以及质量和安全故障保护,以最大限度地减少项目中占主导地位的非物理废物。关键词:精益施工、非实物废弃物、废弃物
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
6
审稿时长
8 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信