{"title":"MANAJEMEN LALU LINTAS AKIBAT PEMBANGUNAN TRANS STUDIO MALL BANDA ACEH","authors":"Jafaruddin Husin, Noer Fadhly, Ashfa Ashfa","doi":"10.29103/tj.v12i2.617","DOIUrl":null,"url":null,"abstract":"Trans Studio Mall is one of the malls in Banda Aceh City, which is located on Jalan T. Panglima Nyak Makam, right next to the Hermes Hotel. This mall has a land area of 13,302 m². This area has a fairly high activity intensity, because Jalan T. Panglima Nyak Makam is commercial. The operation of Trans Studio Mall can also cause traffic impacts on several roads in Banda Aceh City. The purpose of this study is to analyze and provide traffic management scenarios such as handling the road (weaving) by diverting the exit of the Trans Studio Mall vehicle to Jalan Mon Kuta towards Lambhuk and setting road markings, one of which is by closing the U-turn direction. Turn) and redirects it in the direction of the next turn. Calculation of road performance, weaving and U-turn using the 1997 MKJI method. Based on the results of research that has been carried out on traffic performance on the existing condition on the TP Nyak Makam road with service level D, Scenario I was carried out, namely handling weaving by diverting the exit of the Trans Mall vehicle , this is shown by the DS value before handling is 0.82 to 0.71 with service level D to C, scenario II The design of the median without openings in front of the Hermes Hotel can improve traffic management from the service level to the average existing condition D being the road service level B.","PeriodicalId":52898,"journal":{"name":"Teras Jurnal Jurnal Teknik Sipil","volume":" ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-09-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Teras Jurnal Jurnal Teknik Sipil","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.29103/tj.v12i2.617","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
Trans Studio Mall is one of the malls in Banda Aceh City, which is located on Jalan T. Panglima Nyak Makam, right next to the Hermes Hotel. This mall has a land area of 13,302 m². This area has a fairly high activity intensity, because Jalan T. Panglima Nyak Makam is commercial. The operation of Trans Studio Mall can also cause traffic impacts on several roads in Banda Aceh City. The purpose of this study is to analyze and provide traffic management scenarios such as handling the road (weaving) by diverting the exit of the Trans Studio Mall vehicle to Jalan Mon Kuta towards Lambhuk and setting road markings, one of which is by closing the U-turn direction. Turn) and redirects it in the direction of the next turn. Calculation of road performance, weaving and U-turn using the 1997 MKJI method. Based on the results of research that has been carried out on traffic performance on the existing condition on the TP Nyak Makam road with service level D, Scenario I was carried out, namely handling weaving by diverting the exit of the Trans Mall vehicle , this is shown by the DS value before handling is 0.82 to 0.71 with service level D to C, scenario II The design of the median without openings in front of the Hermes Hotel can improve traffic management from the service level to the average existing condition D being the road service level B.