Modelbuilder and Unit Hydrograph for Flood Prediction and Watershed Flow Direction Determination at The West Branch of The Little River, Stowe, Lamoille County, Vermont, USA

Q4 Social Sciences
F. E. S. Silalahi, F. Hidayat
{"title":"Modelbuilder and Unit Hydrograph for Flood Prediction and Watershed Flow Direction Determination at The West Branch of The Little River, Stowe, Lamoille County, Vermont, USA","authors":"F. E. S. Silalahi, F. Hidayat","doi":"10.14710/GEOPLANNING.6.2.89-98","DOIUrl":null,"url":null,"abstract":"The West Branch of the Little River in Stowe, Lamoille County, Vermont has been widely studied, and this area is regularly subject to flooding. The West Branch joins the Little River, which flows into the Winooski and drains into Lake Champlain. This area has undergone extensive development as an economic response to the ski resort industry over the past 50 years, and the recreational pathway is on the banks of the river. The Little River is adjusting to the loss of historic floodplain area, channel modifications (straightening and gravel mining), and runoff changes. In this project, a DEM with 10 and 30 meters resolution will be used to determine the watershed area for the outlet point at the south of Stowe for hydrological analysis. This project intends to describe the watershed flow direction with a unit hydrograph that shows when water discharge at the outlet is at its height during a rainfall event and produce the floods prediction map by predicting the nature of flood events to help in planning and responding to flood events effectively using ArcGIS Pro 2.0. The results show the time it takes water to flow to the outlet ranges from 0 seconds (rain that falls on the outlet itself) to over 8 hours and 46 minutes. The amount of water has accumulated, indicating that water will flow at its fastest when funneling toward the outlet point downstream of the town with no exception, indicating that water will flow at its fastest when funneling toward the outlet point downstream of the town.","PeriodicalId":30789,"journal":{"name":"Geoplanning Journal of Geomatics and Planning","volume":"1 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2020-04-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Geoplanning Journal of Geomatics and Planning","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.14710/GEOPLANNING.6.2.89-98","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"Social Sciences","Score":null,"Total":0}
引用次数: 0

Abstract

The West Branch of the Little River in Stowe, Lamoille County, Vermont has been widely studied, and this area is regularly subject to flooding. The West Branch joins the Little River, which flows into the Winooski and drains into Lake Champlain. This area has undergone extensive development as an economic response to the ski resort industry over the past 50 years, and the recreational pathway is on the banks of the river. The Little River is adjusting to the loss of historic floodplain area, channel modifications (straightening and gravel mining), and runoff changes. In this project, a DEM with 10 and 30 meters resolution will be used to determine the watershed area for the outlet point at the south of Stowe for hydrological analysis. This project intends to describe the watershed flow direction with a unit hydrograph that shows when water discharge at the outlet is at its height during a rainfall event and produce the floods prediction map by predicting the nature of flood events to help in planning and responding to flood events effectively using ArcGIS Pro 2.0. The results show the time it takes water to flow to the outlet ranges from 0 seconds (rain that falls on the outlet itself) to over 8 hours and 46 minutes. The amount of water has accumulated, indicating that water will flow at its fastest when funneling toward the outlet point downstream of the town with no exception, indicating that water will flow at its fastest when funneling toward the outlet point downstream of the town.
美国佛蒙特州拉莫尔县斯托Little River西支流洪水预测和流域流向确定的建模器和单位过程线
佛蒙特州拉莫维尔县斯托的小河西支流已被广泛研究,该地区经常遭受洪水侵袭。西支流与小河汇合,小河流入威努斯基河,排入尚普兰湖。在过去的50年里,这个地区经历了广泛的发展,作为对滑雪胜地产业的经济回应,休闲通道位于河岸上。小河正在适应历史洪泛区的丧失、河道改造(矫直和砾石开采)和径流的变化。在本项目中,将使用10米和30米分辨率的DEM来确定Stowe南部出水点的流域面积,进行水文分析。本项目拟利用单位水文图描述流域水流方向,该水文图显示在降雨事件中出水口的排水量达到最高点,并利用ArcGIS Pro 2.0通过预测洪水事件的性质生成洪水预测图,帮助有效地规划和应对洪水事件。结果显示,水流到出口所需的时间从0秒(落在出口上的雨水)到8小时46分钟不等。累计水量,说明水流向城镇下游出水点方向均为最快,说明水流向城镇下游出水点方向均为最快。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
Geoplanning Journal of Geomatics and Planning
Geoplanning Journal of Geomatics and Planning Earth and Planetary Sciences-Computers in Earth Sciences
CiteScore
1.00
自引率
0.00%
发文量
5
审稿时长
4 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信