ANALYSIS OF OVER CURRENT RELAY AND GROUND FAULT RELAY PROTECTION SYSTEM IN SUB-STATION SP-2 TANAH MIRING USING RELAY COORDINATION WITH ETAP BASED

Soetjipto Soewono, Enni Noprianti
{"title":"ANALYSIS OF OVER CURRENT RELAY AND GROUND FAULT RELAY PROTECTION SYSTEM IN SUB-STATION SP-2 TANAH MIRING USING RELAY COORDINATION WITH ETAP BASED","authors":"Soetjipto Soewono, Enni Noprianti","doi":"10.56327/ijiscs.v4i2.903","DOIUrl":null,"url":null,"abstract":"Short-circuit often occur in electricity sub-station SP-2 Tanah Miring, Merauke -Papua which caused by malfuction of Over Current Relay (OCR) and Ground Fault Relay (GFR). In enhancing the performance, it takes analysis of relay coordination using ETAP. At maximum load of feeder SP-9 (917 A) an OCR setting is 4.5 A with TMS 0.46 seconds, GFR setting is 4.58 A with TMS 0.17 seconds. At minimum load (324 A) OCR setting is 1.62 A with TMS 0.29 seconds as for the GFR setting is 1.62 A with TMS 0.22 seconds. At the maximum load of feeder Kebun Cokelat (995 A) an OCR setting is 4.97 A with TMS 0.46 seconds as for GFR set is 4.97 A with TMS 0.17 seconds. At minimum load 100 A, OCR setting is 0.5 A with TMS 0.43 seconds while GFR setting is 0.5 A with TMS 0.35 seconds. Furthermore, if the minimum load reach 98 A then the coordination time of GFR and OCR is 0,5 seconds. This analysis found that relay prohibited to operate above 1100 A (maximum) and below 98 (minimum) due to if it working out of the load range then the coordination time would not meet the manual standard.","PeriodicalId":32370,"journal":{"name":"IJISCS International Journal of Information System and Computer Science","volume":"1 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2020-08-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"IJISCS International Journal of Information System and Computer Science","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.56327/ijiscs.v4i2.903","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

Abstract

Short-circuit often occur in electricity sub-station SP-2 Tanah Miring, Merauke -Papua which caused by malfuction of Over Current Relay (OCR) and Ground Fault Relay (GFR). In enhancing the performance, it takes analysis of relay coordination using ETAP. At maximum load of feeder SP-9 (917 A) an OCR setting is 4.5 A with TMS 0.46 seconds, GFR setting is 4.58 A with TMS 0.17 seconds. At minimum load (324 A) OCR setting is 1.62 A with TMS 0.29 seconds as for the GFR setting is 1.62 A with TMS 0.22 seconds. At the maximum load of feeder Kebun Cokelat (995 A) an OCR setting is 4.97 A with TMS 0.46 seconds as for GFR set is 4.97 A with TMS 0.17 seconds. At minimum load 100 A, OCR setting is 0.5 A with TMS 0.43 seconds while GFR setting is 0.5 A with TMS 0.35 seconds. Furthermore, if the minimum load reach 98 A then the coordination time of GFR and OCR is 0,5 seconds. This analysis found that relay prohibited to operate above 1100 A (maximum) and below 98 (minimum) due to if it working out of the load range then the coordination time would not meet the manual standard.
sp-2采煤分站过流继电保护与接地故障继电保护系统分析
巴布亚梅劳克省Tanah Miring变电站SP-2经常发生短路,其原因是过电流继电器(OCR)和接地故障继电器(GFR)的故障。为了提高性能,采用ETAP对继电器协调进行了分析。在给料机SP-9(917A)的最大负载下,OCR设置为4.5A,TMS为0.46秒,GFR设置为4.58A,TMS 0.17秒。在最小负载(324A)下,OCR设置为1.62A,TMS为0.29秒,而GFR设置为1.62ATMS为0.22秒。在给料机Kebun-Cokelat(995A)的最大负载下,OCR设置为4.97A,TMS为0.46秒,而GFR设置为4.97A,TMS 0.17秒。在最小负载100 A时,OCR设置为0.5 A,TMS为0.43秒,而GFR设置为0.5 A.TMS为0.35秒。此外,如果最小负载达到98A,则GFR和OCR的协调时间为0.5秒。该分析发现,继电器被禁止在1100 A(最大)以上和98 A(最小)以下运行,因为如果它在负载范围外工作,那么协调时间将不符合手动标准。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
审稿时长
12 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信