Anchorage length of patented wire cables in prestressed bridge girders

Q3 Materials Science
A. Svoboda, L. Klusáček, R. Necas, J. Koláček, J. Strnad, M. Olšák
{"title":"Anchorage length of patented wire cables in prestressed bridge girders","authors":"A. Svoboda, L. Klusáček, R. Necas, J. Koláček, J. Strnad, M. Olšák","doi":"10.2478/kom-2021-0012","DOIUrl":null,"url":null,"abstract":"Abstract This paper briefly describes the methodology, performance and the obtained results of unique experiments performed on original I-73 precast bridge girders. The main objective of the experiments was to determine the actual anchorage length of corroded-through fully grouted prestressing reinforcement (prestressing wires), which is important for determination of the residual load-bearing capacity of prestressed structures. Observation probes leading all the way to the prestressing wires were drilled on selected sections of the girders along the length of the prestressing reinforcement. Optical image acquisition devices were then installed at these probes. Subsequently, controlled breakage of the patented wires (corrosion failure simulation) and observation of the changes that occurred in the prestressing wires after relief of stress were carried out. Evaluation of the experiments was then performed by analyzing the images obtained before and after the prestressing reinforcement failure.","PeriodicalId":17911,"journal":{"name":"Koroze a ochrana materialu","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2021-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Koroze a ochrana materialu","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2478/kom-2021-0012","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"Materials Science","Score":null,"Total":0}
引用次数: 0

Abstract

Abstract This paper briefly describes the methodology, performance and the obtained results of unique experiments performed on original I-73 precast bridge girders. The main objective of the experiments was to determine the actual anchorage length of corroded-through fully grouted prestressing reinforcement (prestressing wires), which is important for determination of the residual load-bearing capacity of prestressed structures. Observation probes leading all the way to the prestressing wires were drilled on selected sections of the girders along the length of the prestressing reinforcement. Optical image acquisition devices were then installed at these probes. Subsequently, controlled breakage of the patented wires (corrosion failure simulation) and observation of the changes that occurred in the prestressing wires after relief of stress were carried out. Evaluation of the experiments was then performed by analyzing the images obtained before and after the prestressing reinforcement failure.
预应力桥梁主梁中专利钢丝绳锚固长度
摘要本文简要介绍了对原I-73预制桥梁主梁进行的独特试验方法、性能和获得的结果。试验的主要目的是确定腐蚀贯通的全灌浆预应力钢筋(预应力索)的实际锚固长度,这对确定预应力结构的剩余承载能力具有重要意义。沿着预应力钢筋的长度,在选定的梁段上钻入一路通往预应力索的观察探头。然后在这些探针上安装光学图像采集装置。随后,对专利钢丝进行了控制断裂(腐蚀失效模拟),并观察了预应力钢丝在解除应力后的变化。通过分析预应力钢筋破坏前后的图像,对试验结果进行评价。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
Koroze a ochrana materialu
Koroze a ochrana materialu Materials Science-Materials Science (all)
CiteScore
3.00
自引率
0.00%
发文量
8
审稿时长
14 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信