{"title":"Simulation Model of Production System Using Dynamic System Approach to Increase Production Capacity Tofu Factory","authors":"T. Talitha, Rexza Berliyana","doi":"10.31315/opsi.v15i2.8059","DOIUrl":null,"url":null,"abstract":"The speed in distributing the products of the industry is influenced by the speed of production produced by the industry itself. SMEs know that ECO is one of the manufacturing industries engaged in food manufacturing. there are obstacles (problems) that are experienced, namely the occurrence of inequality between the production capacity of tofu that can be produced and the demand for tofu that must be met. The purpose of this study is to increase the production capacity of Tofu Eco SMEs in terms of increasing working time. The method used in this research is the dynamic system method using the PLE vensim software. The results of the study show that based on the actual system conditions, it is known that there are 25 workers with 8 working hours per day, and an average production capacity of 957 barrels per month is obtained month with an average demand of 1005 barrels /month. The results of the alternative simulation I, have an average production capacity of 1,080 barrels/month. The results of the scenario II simulation show that the average production capacity is 1,230 barrels/month. From the simulation results of alternative scenarios, it can be seen that for production demand below 1,080 barrels/month, the alternative used is to add 1 hour (60 minutes) of overtime, while for requests above 1,079 barrels/month with a maximum production demand of 1,255 barrels/month, alternative scenarios can be used. II with the addition of 2 hours 30 minutes (150 minutes) of overtime.","PeriodicalId":34167,"journal":{"name":"OPSI","volume":" ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-12-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"OPSI","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.31315/opsi.v15i2.8059","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

Abstract

The speed in distributing the products of the industry is influenced by the speed of production produced by the industry itself. SMEs know that ECO is one of the manufacturing industries engaged in food manufacturing. there are obstacles (problems) that are experienced, namely the occurrence of inequality between the production capacity of tofu that can be produced and the demand for tofu that must be met. The purpose of this study is to increase the production capacity of Tofu Eco SMEs in terms of increasing working time. The method used in this research is the dynamic system method using the PLE vensim software. The results of the study show that based on the actual system conditions, it is known that there are 25 workers with 8 working hours per day, and an average production capacity of 957 barrels per month is obtained month with an average demand of 1005 barrels /month. The results of the alternative simulation I, have an average production capacity of 1,080 barrels/month. The results of the scenario II simulation show that the average production capacity is 1,230 barrels/month. From the simulation results of alternative scenarios, it can be seen that for production demand below 1,080 barrels/month, the alternative used is to add 1 hour (60 minutes) of overtime, while for requests above 1,079 barrels/month with a maximum production demand of 1,255 barrels/month, alternative scenarios can be used. II with the addition of 2 hours 30 minutes (150 minutes) of overtime.
利用动态系统方法建立豆腐厂生产系统仿真模型
该行业产品的分销速度受该行业自身生产速度的影响。中小企业知道ECO是从事食品制造的制造业之一。有经历过的障碍(问题),即可以生产的豆腐的生产能力与必须满足的豆腐的需求之间出现了不平等。本研究的目的是通过增加工作时间来提高豆腐生态中小企业的生产能力。本研究采用的方法是采用PLE vensim软件的动态系统方法。研究结果表明,根据实际系统条件,已知工人25人,每天工作8小时,每月平均生产能力为957桶/月,平均需求量为1005桶/月。替代模拟I的结果显示,平均生产能力为1,080桶/月。情景II的模拟结果显示,平均生产能力为1230桶/月。从备选方案的模拟结果可以看出,对于1080桶/月以下的生产需求,采用的备选方案是增加1小时(60分钟)的加班时间,而对于1079桶/月以上的需求,最大生产需求为1255桶/月,则可以采用备选方案。外加2小时30分钟(150分钟)的加班时间。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
16
审稿时长
12 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信