A conceptual framework for integrating Facility Layout and Production Scheduling in Flowshop Manufacturing Cells decisions

Sebastián Cáceres-Gelvez, M. Arango-Serna, J. Zapata-cortes
{"title":"A conceptual framework for integrating Facility Layout and Production Scheduling in Flowshop Manufacturing Cells decisions","authors":"Sebastián Cáceres-Gelvez, M. Arango-Serna, J. Zapata-cortes","doi":"10.24050/reia.v19i38.1543","DOIUrl":null,"url":null,"abstract":"Objective: In this paper, a conceptual framework for integrating production scheduling in flowshop manufacturing cells, known as flowshop group scheduling (FSGSP), and unequal-area facility layout (UAFLP) decisions is proposed. Materials and Methods: First, a brief literature review is carried out to identify the elements, solution techniques and complementary decisions for the UAFLP, FSGSP and layout-scheduling approaches. Results: Based on the results of the literature review a 4-phase integrative model is proposed to integrate these decisions, based on a lean manufacturing environment. The phases include the input data collection and preparation process, the definition of the UAFLP, FSGSP and other complementary decisions, the optimization of the decisions, and the selection of the best alternative. Conclusions: The integration of these decisions using the proposed framework can achieve benefits related to the reduction of mudas, such as material handling, high work-in-process inventory levels and setup times for real, industrial contexts.","PeriodicalId":21275,"journal":{"name":"Revista EIA","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2022-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Revista EIA","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.24050/reia.v19i38.1543","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

Objective: In this paper, a conceptual framework for integrating production scheduling in flowshop manufacturing cells, known as flowshop group scheduling (FSGSP), and unequal-area facility layout (UAFLP) decisions is proposed. Materials and Methods: First, a brief literature review is carried out to identify the elements, solution techniques and complementary decisions for the UAFLP, FSGSP and layout-scheduling approaches. Results: Based on the results of the literature review a 4-phase integrative model is proposed to integrate these decisions, based on a lean manufacturing environment. The phases include the input data collection and preparation process, the definition of the UAFLP, FSGSP and other complementary decisions, the optimization of the decisions, and the selection of the best alternative. Conclusions: The integration of these decisions using the proposed framework can achieve benefits related to the reduction of mudas, such as material handling, high work-in-process inventory levels and setup times for real, industrial contexts.
在Flowshop制造单元决策中集成设备布局和生产调度的概念框架
目的:本文提出了一个集成流程图制造单元生产调度的概念框架,称为流程图组调度(FSGSP)和不等面积设施布局(UAFLP)决策。材料和方法:首先,进行了简短的文献综述,以确定UAFLP、FSGSP和布局调度方法的要素、解决技术和补充决策。结果:基于文献综述的结果,提出了一个基于精益制造环境的四阶段集成模型来集成这些决策。这些阶段包括输入数据的收集和准备过程、UAFLP、FSGSP和其他补充决策的定义、决策的优化以及最佳替代方案的选择。结论:使用所提出的框架整合这些决策可以实现与减少muda相关的好处,例如材料处理、高在制品库存水平和真实工业环境的设置时间。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
31
审稿时长
30 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信