Investigation of theoretical hydroelectric potential with GIS-based model in Buyuk Menderes Basin, Turkey

IF 2 Q4 ENERGY & FUELS
C. Koç, Yıldırım Bayazıt, Selami Yurdan Özgül
{"title":"Investigation of theoretical hydroelectric potential with GIS-based model in Buyuk Menderes Basin, Turkey","authors":"C. Koç, Yıldırım Bayazıt, Selami Yurdan Özgül","doi":"10.1080/14786451.2022.2147525","DOIUrl":null,"url":null,"abstract":"ABSTRACT In this study, using a Geographical Information System (GIS) based model method, locations having theoretical hydroelectric energy potential were identified in the Buyuk Menderes basin, one of Turkey's largest basins. According to the installed power potential on the examined basin, 33 sites below 10 MW, 57 sites between 10 and 50 MW, 4 sites between 50 and 100 MW, and 1 site over 100 MW were found as a consequence of the study. While the theoretical hydroelectric energy potential in the whole basin is 886.55 MW at 70% turbine efficiency, the installed power in the basin is currently 302.02 MW. According to these results, only 34.07% of the total hydro potential in the basin is used today.","PeriodicalId":14406,"journal":{"name":"International Journal of Sustainable Energy","volume":"41 1","pages":"2185 - 2196"},"PeriodicalIF":2.0000,"publicationDate":"2022-11-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Sustainable Energy","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1080/14786451.2022.2147525","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENERGY & FUELS","Score":null,"Total":0}
引用次数: 0

Abstract

ABSTRACT In this study, using a Geographical Information System (GIS) based model method, locations having theoretical hydroelectric energy potential were identified in the Buyuk Menderes basin, one of Turkey's largest basins. According to the installed power potential on the examined basin, 33 sites below 10 MW, 57 sites between 10 and 50 MW, 4 sites between 50 and 100 MW, and 1 site over 100 MW were found as a consequence of the study. While the theoretical hydroelectric energy potential in the whole basin is 886.55 MW at 70% turbine efficiency, the installed power in the basin is currently 302.02 MW. According to these results, only 34.07% of the total hydro potential in the basin is used today.
基于GIS模型的土耳其Buyuk-Menderes盆地理论水力潜力调查
在这项研究中,使用基于地理信息系统(GIS)的模型方法,在土耳其最大的盆地之一Buyuk Menderes盆地确定了具有理论水力发电潜力的位置。根据研究流域的装机潜力,研究发现了33个低于10兆瓦的地点,57个10至50兆瓦的地点,4个50至100兆瓦的地点,1个超过100兆瓦的地点。在70%水轮机效率下,整个流域的理论水力发电潜力为886.55 MW,而目前该流域的装机容量为302.02 MW。根据这些结果,目前仅利用了该流域总水势的34.07%。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
CiteScore
5.70
自引率
3.20%
发文量
52
期刊介绍: Engineering and sustainable development are intrinsically linked. All capital plant and every consumable product depends on an engineering input through design, manufacture and operation, if not for the product itself then for the equipment required to process and transport the raw materials and the final product. Many aspects of sustainable development depend directly on appropriate and timely actions by engineers. Engineering is an extended process of analysis, synthesis, evaluation and execution and, therefore, it is argued that engineers must be involved from the outset of any proposal to develop sustainable solutions. Engineering embraces many disciplines and truly sustainable solutions are usually inter-disciplinary in nature.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信