Evaluation of Unit Rates Bids of Common Building Items

Q2 Business, Management and Accounting
O. Oladimeji
{"title":"Evaluation of Unit Rates Bids of Common Building Items","authors":"O. Oladimeji","doi":"10.2478/jeppm-2021-0015","DOIUrl":null,"url":null,"abstract":"Abstract It is important to assess firms’ financial health in the harsh construction market of developing countries. This study seeks to achieve this by assessing locally owned construction firms’ (LOCOFs) financial performance through evaluating firms’ bill of quantities (BOQ) contract sums and bid unit rates of common building items. Accessible 60 BOQ of the 79 BOQ of building projects awarded to various LOCOFs from 2007 to 2015 by federal universities and federal universities teaching hospitals in Southwest Nigeria were obtained from the institutional archives. Regression analysis of the contract sums and bid unit rates of common building construction items of works such as concrete, sandcrete block, iron, mortar and floor tiles were carried out. LOCOFs’ bid unit rates were compared with published unit rates and Nigeria consumer price index (CPI) within the study period and inferences bothering on firms’ pricing pattern and financial viability of firms based on items of work unit rates were highlighted and discussed. The results showed that 119 out of a total 461 unit rates values representing 25.81% of the LOCOFs bided unit rates were higher than the published unit rates. LOCOFs unit rates trend decreased within 3 to 4 consecutive years while the Nigeria CPI trend increased all through the years considered in the study. This implies that LOCOFs common items of work bids unit rates were not always influenced by the prevailing prices of goods and services in Nigeria. A possible reason for this is the lowest tender selection criteria which influences LOCOFs’ bided unit rates thereby leading to the acclaimed compromise in the quality of construction output and stunted financial performance.","PeriodicalId":53274,"journal":{"name":"Journal of Engineering Project and Production Management","volume":"42 1","pages":"145 - 157"},"PeriodicalIF":0.0000,"publicationDate":"2020-10-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Engineering Project and Production Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2478/jeppm-2021-0015","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"Business, Management and Accounting","Score":null,"Total":0}
引用次数: 0

Abstract

Abstract It is important to assess firms’ financial health in the harsh construction market of developing countries. This study seeks to achieve this by assessing locally owned construction firms’ (LOCOFs) financial performance through evaluating firms’ bill of quantities (BOQ) contract sums and bid unit rates of common building items. Accessible 60 BOQ of the 79 BOQ of building projects awarded to various LOCOFs from 2007 to 2015 by federal universities and federal universities teaching hospitals in Southwest Nigeria were obtained from the institutional archives. Regression analysis of the contract sums and bid unit rates of common building construction items of works such as concrete, sandcrete block, iron, mortar and floor tiles were carried out. LOCOFs’ bid unit rates were compared with published unit rates and Nigeria consumer price index (CPI) within the study period and inferences bothering on firms’ pricing pattern and financial viability of firms based on items of work unit rates were highlighted and discussed. The results showed that 119 out of a total 461 unit rates values representing 25.81% of the LOCOFs bided unit rates were higher than the published unit rates. LOCOFs unit rates trend decreased within 3 to 4 consecutive years while the Nigeria CPI trend increased all through the years considered in the study. This implies that LOCOFs common items of work bids unit rates were not always influenced by the prevailing prices of goods and services in Nigeria. A possible reason for this is the lowest tender selection criteria which influences LOCOFs’ bided unit rates thereby leading to the acclaimed compromise in the quality of construction output and stunted financial performance.
常用建筑项目单价投标评估
摘要:在发展中国家严峻的建筑市场中,评估企业的财务健康状况非常重要。本研究旨在通过评估当地拥有的建筑公司(LOCOFs)的财务绩效,通过评估公司的工程量清单(BOQ)合同金额和常见建筑项目的投标单位率来实现这一目标。从2007年至2015年,尼日利亚西南部联邦大学和联邦大学教学医院授予各locof的79个建筑项目清单中,有60个清单清单来自机构档案。对混凝土、砂砌块、铁、砂浆、地砖等常用建筑施工项目的合同额和投标单价进行了回归分析。在研究期间,将LOCOFs的投标单位费率与公布的单位费率和尼日利亚消费者价格指数(CPI)进行了比较,并强调和讨论了基于工作单位费率项目的公司定价模式和公司财务可行性的影响。结果显示,在总共461个单位价格中,有119个单位价格高于公布的单位价格,占LOCOFs投标单位价格的25.81%。LOCOFs单位率在连续3到4年内呈下降趋势,而尼日利亚的CPI趋势在研究中考虑的所有年份都呈上升趋势。这意味着locof的共同工程项目投标单位费率并不总是受到尼日利亚现行商品和服务价格的影响。造成这种情况的一个可能原因是,最低的投标选择标准影响了locof的投标单位费率,从而导致了建筑产出质量的折衷和财务业绩的停滞。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
Journal of Engineering Project and Production Management
Journal of Engineering Project and Production Management Business, Management and Accounting-Business, Management and Accounting (miscellaneous)
CiteScore
2.30
自引率
0.00%
发文量
24
审稿时长
30 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信