Jian Zeng (曾剑), Gang Chen (陈刚), Cun-hong Pan (潘存鸿), Zhi-yong Zhang (张芝永)
{"title":"Effect of dike line adjustment on the tidal bore in the Qiantang Estuary, China","authors":"Jian Zeng (曾剑), Gang Chen (陈刚), Cun-hong Pan (潘存鸿), Zhi-yong Zhang (张芝永)","doi":"10.1016/S1001-6058(16)60756-4","DOIUrl":null,"url":null,"abstract":"<div><p>In this paper, the effect of the dike line adjustment on the Qiantang Tidal Bore (QTB) is studied by physcial experiments. A lab-scale physical model of the Qiantang Estuary is built and the tidal bore is generated. With this model, the formation and pro-pagation processes of the tidal bore are simulated with or without the dike line adjustment. It is shown that the adjusted dike line changes the direction of the reflected tidal bore. The height of the tidal bore increases in the upstream region where the dike line is contracted. In the tested bent and forking regimes, the bore height at the upstream station is increased by 0.10 m and 0.04 m, respectively. Furthermore, the crossing bore still exists near the Daquekou station and the location slightly moves by about 3 km to the downstream region.</p></div>","PeriodicalId":66131,"journal":{"name":"水动力学研究与进展:英文版","volume":"29 3","pages":"Pages 452-459"},"PeriodicalIF":3.4000,"publicationDate":"2017-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1016/S1001-6058(16)60756-4","citationCount":"12","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"水动力学研究与进展:英文版","FirstCategoryId":"1087","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S1001605816607564","RegionNum":3,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"MECHANICS","Score":null,"Total":0}
引用次数: 12
Abstract
In this paper, the effect of the dike line adjustment on the Qiantang Tidal Bore (QTB) is studied by physcial experiments. A lab-scale physical model of the Qiantang Estuary is built and the tidal bore is generated. With this model, the formation and pro-pagation processes of the tidal bore are simulated with or without the dike line adjustment. It is shown that the adjusted dike line changes the direction of the reflected tidal bore. The height of the tidal bore increases in the upstream region where the dike line is contracted. In the tested bent and forking regimes, the bore height at the upstream station is increased by 0.10 m and 0.04 m, respectively. Furthermore, the crossing bore still exists near the Daquekou station and the location slightly moves by about 3 km to the downstream region.