The challenges of land development for housing provision in New Zealand.

Wajiha Mohsin Shahzad, Adeel Hassan, James Olabode Bamidele Rotimi
{"title":"The challenges of land development for housing provision in New Zealand.","authors":"Wajiha Mohsin Shahzad,&nbsp;Adeel Hassan,&nbsp;James Olabode Bamidele Rotimi","doi":"10.1007/s10901-021-09896-z","DOIUrl":null,"url":null,"abstract":"<p><p>The land development process in New Zealand is criticised for causing delays in the delivery of adequate housing. These delays upset the demand and supply equilibrium, leading to housing shortages, expensive builds and rentals. This study investigates the challenges in land development, to ascertain the factors that are limiting its efficiency as a major catalyst to housing provision. An understanding of the complexities of the development process could enable the suggestion of feasible solutions for achieving housing goals. A two-stage process was adopted to achieve this study objective. In stage one, a critical review of relevant literature helped to identify 48 measurement items. Those items were included in a questionnaire survey in the second stage, to gather data from stakeholders involved in land development process in New Zealand. Using relative importance index (RII) method, nine significant challenges were identified, which were then categorised and discussed in accordance with the construction stakeholder groups that are responsible for creating those challenges. The nine major challenges are: delay in reviews and approval of documents; scope change; lengthy consent application processes; late response to queries by regulatory authorities; poor interaction between regulatory authorities; poor coordination within regulatory authorities; poor planning and scheduling; design errors and slow progress during design development. Findings of this study highlight the need for the development of proper workplan for consent processing, reasonable factoring of the risks associated with scope changes in the land development process, and the enhancement of project management skills of land development contractors.</p>","PeriodicalId":73781,"journal":{"name":"Journal of housing and the built environment : HBE","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2022-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://www.ncbi.nlm.nih.gov/pmc/articles/PMC8409274/pdf/","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of housing and the built environment : HBE","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1007/s10901-021-09896-z","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"2021/9/1 0:00:00","PubModel":"Epub","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

Abstract

The land development process in New Zealand is criticised for causing delays in the delivery of adequate housing. These delays upset the demand and supply equilibrium, leading to housing shortages, expensive builds and rentals. This study investigates the challenges in land development, to ascertain the factors that are limiting its efficiency as a major catalyst to housing provision. An understanding of the complexities of the development process could enable the suggestion of feasible solutions for achieving housing goals. A two-stage process was adopted to achieve this study objective. In stage one, a critical review of relevant literature helped to identify 48 measurement items. Those items were included in a questionnaire survey in the second stage, to gather data from stakeholders involved in land development process in New Zealand. Using relative importance index (RII) method, nine significant challenges were identified, which were then categorised and discussed in accordance with the construction stakeholder groups that are responsible for creating those challenges. The nine major challenges are: delay in reviews and approval of documents; scope change; lengthy consent application processes; late response to queries by regulatory authorities; poor interaction between regulatory authorities; poor coordination within regulatory authorities; poor planning and scheduling; design errors and slow progress during design development. Findings of this study highlight the need for the development of proper workplan for consent processing, reasonable factoring of the risks associated with scope changes in the land development process, and the enhancement of project management skills of land development contractors.

新西兰为提供住房而开发土地的挑战。
新西兰的土地开发过程因导致适当住房交付的延误而受到批评。这些延误扰乱了供需平衡,导致住房短缺,建筑和租金昂贵。本研究调查了土地开发中的挑战,以确定限制其作为住房供应主要催化剂的效率的因素。了解发展过程的复杂性可以提出实现住房目标的可行解决办法。采用两个阶段的过程来实现这一研究目标。在第一阶段,对相关文献的批判性回顾有助于确定48个测量项目。这些项目包括在第二阶段的问卷调查中,以收集参与新西兰土地开发过程的利益相关者的数据。使用相对重要性指数(RII)方法,确定了九个重大挑战,然后根据负责创造这些挑战的建设利益相关者群体对其进行分类和讨论。九项主要挑战是:文件审查和批准的延迟;范围内变化;冗长的同意申请程序;对监管部门的询问答复较晚;监管部门之间互动不良;监管机构内部协调不力;计划和调度不周;设计错误和设计开发过程中的缓慢进展。研究结果显示,政府有需要制订适当的工作计划,处理同意程序,合理考虑土地发展过程中涉及范围改变的风险,以及提高土地发展承办商的项目管理技巧。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信