{"title":"How going with the flow led to a better patient journey.","authors":"","doi":"","DOIUrl":null,"url":null,"abstract":"<p><p>A new £60m hospital building was the catalyst for an improve system of patient flow that was to transform the public's experience of Morriston Hospital in Swansea.</p>","PeriodicalId":75012,"journal":{"name":"The Health service journal","volume":"127 6504","pages":"10-1"},"PeriodicalIF":0.0000,"publicationDate":"2017-02-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"The Health service journal","FirstCategoryId":"1085","ListUrlMain":"","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
A new £60m hospital building was the catalyst for an improve system of patient flow that was to transform the public's experience of Morriston Hospital in Swansea.