{"title":"Florida hospital saves 5.3 M dollars by adopting principles of lean manufacturing.","authors":"","doi":"","DOIUrl":null,"url":null,"abstract":"<p><p>Florida hospital saves 5.3M dollars by adopting principles of lean manufacturing. Surgery cancellations have been slashed from 13% of cases to less than 3%, while emergency department admissions have increased by 20%. Those are just two of the results of a quality improvement project at Lee Memorial Health System in Fort Myers, FL, that focused on using the principles of lean manufacturing to improve patient flow in the five-hospital system</p>","PeriodicalId":85258,"journal":{"name":"Performance improvement advisor","volume":"9 1","pages":"10-11, 1"},"PeriodicalIF":0.0000,"publicationDate":"2005-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Performance improvement advisor","FirstCategoryId":"1085","ListUrlMain":"","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
Florida hospital saves 5.3M dollars by adopting principles of lean manufacturing. Surgery cancellations have been slashed from 13% of cases to less than 3%, while emergency department admissions have increased by 20%. Those are just two of the results of a quality improvement project at Lee Memorial Health System in Fort Myers, FL, that focused on using the principles of lean manufacturing to improve patient flow in the five-hospital system