{"title":"How to develop an effective decentralized laboratory testing program.","authors":"C P Collier, R L Houlden, S L Rhymer","doi":"","DOIUrl":null,"url":null,"abstract":"<p><p>In this article, we offer practical guidelines for developing an effective decentralized laboratory testing (DLT) program. Based on more than 10 years of experience with a DLT program for bedside blood glucose monitoring, we have identified eight essential steps in this process, including: developing an effective multidisciplinary DLT committee that oversees the various DLT programs; performing a needs analysis and a cost analysis as part of the application for approval of a program from the DLT committee; instrument selection and method evaluation; and, finally, implementing a DLT program including initiating a quality assurance program. A collaborative effort by everyone from the beginning is an important key to success.</p>","PeriodicalId":79576,"journal":{"name":"Clinical laboratory management review : official publication of the Clinical Laboratory Management Association","volume":"12 6","pages":"418-23"},"PeriodicalIF":0.0000,"publicationDate":"1998-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Clinical laboratory management review : official publication of the Clinical Laboratory Management Association","FirstCategoryId":"1085","ListUrlMain":"","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
In this article, we offer practical guidelines for developing an effective decentralized laboratory testing (DLT) program. Based on more than 10 years of experience with a DLT program for bedside blood glucose monitoring, we have identified eight essential steps in this process, including: developing an effective multidisciplinary DLT committee that oversees the various DLT programs; performing a needs analysis and a cost analysis as part of the application for approval of a program from the DLT committee; instrument selection and method evaluation; and, finally, implementing a DLT program including initiating a quality assurance program. A collaborative effort by everyone from the beginning is an important key to success.