Productivity, cost and quality control (Part II).

{"title":"Productivity, cost and quality control (Part II).","authors":"","doi":"","DOIUrl":null,"url":null,"abstract":"<p><p>It can be shown that with a relatively straight forward computerized program it is possible to achieve virtually any \"cut\" of data desired for management purposes. This system provides for establishment of self-comparative standards. This system allows for some of the following factors to be identified. An employee who is having trouble with a particular category of equipment, whether in maintenance of service. This then would indicate that this technician would need training. (2) Excessive equipment repair which may demonstrate inappropriate usage or age of the equipment incurring costs generally above, for example, ten percent which has for two decades been the benchmark for annualized service cost maximums per unit.</p>","PeriodicalId":79826,"journal":{"name":"Clinical engineering information service","volume":"11 6","pages":"184-91"},"PeriodicalIF":0.0000,"publicationDate":"1987-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Clinical engineering information service","FirstCategoryId":"1085","ListUrlMain":"","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

It can be shown that with a relatively straight forward computerized program it is possible to achieve virtually any "cut" of data desired for management purposes. This system provides for establishment of self-comparative standards. This system allows for some of the following factors to be identified. An employee who is having trouble with a particular category of equipment, whether in maintenance of service. This then would indicate that this technician would need training. (2) Excessive equipment repair which may demonstrate inappropriate usage or age of the equipment incurring costs generally above, for example, ten percent which has for two decades been the benchmark for annualized service cost maximums per unit.

生产率、成本和质量控制(第二部分)。
可以证明,使用一个相对直接的计算机程序,实际上可以实现管理目的所需的任何数据“切割”。这一制度规定建立自我比较标准。该系统允许识别以下一些因素。在某一类设备的维护或服务方面遇到困难的员工。这将表明该技术人员需要培训。(2)过度的设备维修,可能表明设备使用不当或老化,导致成本通常高于,例如,二十年来每台设备的年化服务成本最高基准为10%。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信