More about hospital generator sizing, testing and exercising.

H O Nash
{"title":"More about hospital generator sizing, testing and exercising.","authors":"H O Nash","doi":"","DOIUrl":null,"url":null,"abstract":"<p><p>The National Fire Protection Agency (NFPA) and the Joint Commission on Accreditation of Healthcare Organizations (JCAHO) requirements for testing and exercising on-site standby generators are intended to prevent testing with insufficient load. However, engineers grapple with local and state enforcement agencies who require needlessly oversized standby generators, putting the engineer in the difficult position of using supplementary load banks because of insufficient building load for testing. This document examines the latest changes in NFPA codes and the JCAHO policy that aim to resolve testing issues.</p>","PeriodicalId":79949,"journal":{"name":"Healthcare facilities management series","volume":" ","pages":"1-9"},"PeriodicalIF":0.0000,"publicationDate":"1996-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Healthcare facilities management series","FirstCategoryId":"1085","ListUrlMain":"","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The National Fire Protection Agency (NFPA) and the Joint Commission on Accreditation of Healthcare Organizations (JCAHO) requirements for testing and exercising on-site standby generators are intended to prevent testing with insufficient load. However, engineers grapple with local and state enforcement agencies who require needlessly oversized standby generators, putting the engineer in the difficult position of using supplementary load banks because of insufficient building load for testing. This document examines the latest changes in NFPA codes and the JCAHO policy that aim to resolve testing issues.

更多关于医院发电机的尺寸,测试和锻炼。
美国国家消防局(NFPA)和医疗机构认证联合委员会(JCAHO)对测试和现场备用发电机的要求旨在防止在负荷不足的情况下进行测试。然而,工程师们与地方和州执法机构进行斗争,这些机构需要不必要的超大备用发电机,这使得工程师们处于使用补充负载库的困难境地,因为用于测试的建筑负载不足。本文件探讨了NFPA规范和JCAHO政策的最新变化,旨在解决测试问题。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信