{"title":"Project-managing the commissioning of the Chelsea and Westminster Hospital.","authors":"T Ciorra","doi":"","DOIUrl":null,"url":null,"abstract":"<p><p>Feasibility studies to establish the reality of planning, designing and building a major new (650-bed) general teaching hospital on a restricted urban site in a time-scale of five years--instead of the more usual time-scale of twelve or more years for a similar UK National Health Service building--commenced almost six years ago. These studies constituted the groundwork for the birth of the new Chelsea and Westminster Hospital. This article discusses the process and time span of the commissioning and occupation of this new hospital, and deals specifically with the problems encountered.</p>","PeriodicalId":76826,"journal":{"name":"World hospitals","volume":"29 2","pages":"25-9"},"PeriodicalIF":0.0000,"publicationDate":"1993-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"World hospitals","FirstCategoryId":"1085","ListUrlMain":"","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Feasibility studies to establish the reality of planning, designing and building a major new (650-bed) general teaching hospital on a restricted urban site in a time-scale of five years--instead of the more usual time-scale of twelve or more years for a similar UK National Health Service building--commenced almost six years ago. These studies constituted the groundwork for the birth of the new Chelsea and Westminster Hospital. This article discusses the process and time span of the commissioning and occupation of this new hospital, and deals specifically with the problems encountered.

管理切尔西和威斯敏斯特医院的调试项目。
近六年前开始进行可行性研究,以确定规划、设计和在一个受限制的城市场地上建造一个新的大型(650个床位)综合教学医院的可行性,时间尺度为五年,而不是英国国民医疗服务体系(nhs)类似建筑通常需要12年或更长时间。这些研究为新切尔西和威斯敏斯特医院的诞生奠定了基础。本文论述了该新医院的投用过程和时间跨度,并对所遇到的问题进行了具体的处理。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信