{"title":"Reporting and scheduling in-study inspections with the study director using microsoft Excel.","authors":"T T Kilcoin, D E Mayer","doi":"","DOIUrl":null,"url":null,"abstract":"<p><p>Our Environmental and Metabolic Fate division conducts a variety of different studies that can require between 1 month and 3 years to complete. Our master schedule for this division can contain as many as 50-75 of these studies. Since the Good Laboratory Practices (GLP) regulations require in-study inspections at intervals adequate to assure study integrity and our quality assurance unit (QAU) standard operating procedure (SOP) requires us to monitor studies that last longer than 3 months at least once a quarter, in-study inspection scheduling can be challenging. In order to keep up with the work load described we have developed a method using a spreadsheet program, Excel, to facilitate in-study inspection scheduling through periodic reporting of all QAU inspection activity to the study director. This report makes the scheduling of critical phase and quarterly inspections a cooperative effort between the study director and QAU auditor. The details of the development and utilization of Excel for these \"in-study inspection tracking reports\" are presented.</p>","PeriodicalId":77339,"journal":{"name":"Quality assurance (San Diego, Calif.)","volume":"5 2","pages":"133-40"},"PeriodicalIF":0.0000,"publicationDate":"1997-04-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Quality assurance (San Diego, Calif.)","FirstCategoryId":"1085","ListUrlMain":"","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
Our Environmental and Metabolic Fate division conducts a variety of different studies that can require between 1 month and 3 years to complete. Our master schedule for this division can contain as many as 50-75 of these studies. Since the Good Laboratory Practices (GLP) regulations require in-study inspections at intervals adequate to assure study integrity and our quality assurance unit (QAU) standard operating procedure (SOP) requires us to monitor studies that last longer than 3 months at least once a quarter, in-study inspection scheduling can be challenging. In order to keep up with the work load described we have developed a method using a spreadsheet program, Excel, to facilitate in-study inspection scheduling through periodic reporting of all QAU inspection activity to the study director. This report makes the scheduling of critical phase and quarterly inspections a cooperative effort between the study director and QAU auditor. The details of the development and utilization of Excel for these "in-study inspection tracking reports" are presented.