[Research on Opportunistic Maintenance Strategy for Hospital Diagnostic Equipment Considering Mixed Time Windows Based on INSGA-Ⅱ].

Q4 Medicine
Chenjie Guo, Qinming Liu
{"title":"[Research on Opportunistic Maintenance Strategy for Hospital Diagnostic Equipment Considering Mixed Time Windows Based on INSGA-Ⅱ].","authors":"Chenjie Guo, Qinming Liu","doi":"10.12455/j.issn.1671-7104.260260","DOIUrl":null,"url":null,"abstract":"<p><strong>Objective: </strong>To address the issues of high maintenance costs, patient care disruption due to equipment downtime, and low maintenance efficiency in large-scale hospital diagnostic equipment, this study aims to develop a maintenance strategy that is more aligned with actual clinical practices.</p><p><strong>Methods: </strong>First, the specific characteristics of diagnostic equipment maintenance in terms of patient safety, equipment quality control, and downtime impact are analyzed, and a single-component failure rate evolution model that accounts for equipment performance degradation is constructed. Second, a mixed time window mechanism consisting of soft and hard time windows is introduced to simulate the flexibility of clinical maintenance scheduling and the risks and costs associated with maintenance node deviations. On this basis, a multi-objective opportunistic maintenance optimization model is established, aiming to minimize preventive maintenance costs and opportunistic maintenance costs, while maximizing the improvement in effective age.</p><p><strong>Results: </strong>An improved non-dominated sorting genetic algorithm Ⅱ (INSGA-Ⅱ) is employed to solve the model. Compared with traditional methods, the proposed model can effectively reduce the frequency of equipment downtime, extend the average maintenance interval in the optimized scheme, and theoretically increase equipment availability.</p><p><strong>Conclusion: </strong>The proposed model can ensure equipment reliability while balancing economic efficiency and clinical applicability, providing decision-making support for hospital medical engineering departments to formulate scientific equipment maintenance plans.</p>","PeriodicalId":52535,"journal":{"name":"中国医疗器械杂志","volume":"50 5","pages":"532-540"},"PeriodicalIF":0.0000,"publicationDate":"2026-09-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"中国医疗器械杂志","FirstCategoryId":"1087","ListUrlMain":"https://doi.org/10.12455/j.issn.1671-7104.260260","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"Medicine","Score":null,"Total":0}
引用次数: 0

Abstract

Objective: To address the issues of high maintenance costs, patient care disruption due to equipment downtime, and low maintenance efficiency in large-scale hospital diagnostic equipment, this study aims to develop a maintenance strategy that is more aligned with actual clinical practices.

Methods: First, the specific characteristics of diagnostic equipment maintenance in terms of patient safety, equipment quality control, and downtime impact are analyzed, and a single-component failure rate evolution model that accounts for equipment performance degradation is constructed. Second, a mixed time window mechanism consisting of soft and hard time windows is introduced to simulate the flexibility of clinical maintenance scheduling and the risks and costs associated with maintenance node deviations. On this basis, a multi-objective opportunistic maintenance optimization model is established, aiming to minimize preventive maintenance costs and opportunistic maintenance costs, while maximizing the improvement in effective age.

Results: An improved non-dominated sorting genetic algorithm Ⅱ (INSGA-Ⅱ) is employed to solve the model. Compared with traditional methods, the proposed model can effectively reduce the frequency of equipment downtime, extend the average maintenance interval in the optimized scheme, and theoretically increase equipment availability.

Conclusion: The proposed model can ensure equipment reliability while balancing economic efficiency and clinical applicability, providing decision-making support for hospital medical engineering departments to formulate scientific equipment maintenance plans.

[基于INSGA-Ⅱ的考虑混合时间窗的医院诊断设备机会维护策略研究]。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
中国医疗器械杂志
中国医疗器械杂志 Medicine-Medicine (all)
CiteScore
0.40
自引率
0.00%
发文量
8086
期刊介绍: Chinese Journal of Medical Instrumentation mainly reports on the development, progress, research and development, production, clinical application, management, and maintenance of medical devices and biomedical engineering. Its aim is to promote the exchange of information on medical devices and biomedical engineering in China and turn the journal into a high-quality academic journal that leads academic directions and advocates academic debates.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信
小红书