Exformer: A Transformer-Based Forecasting Framework with Temporal Knowledge Assistance for Multistep Multivariate Influent Prediction in Wastewater Treatment Plants

IF 4.5 Q1 ENVIRONMENTAL SCIENCES
ACS ES&T water Pub Date : 2026-10-09 Epub Date: 2026-09-30 DOI:10.1021/acsestwater.6c00503
Ziqing Ye, Qilin Wang, Yiqi Liu
{"title":"Exformer: A Transformer-Based Forecasting Framework with Temporal Knowledge Assistance for Multistep Multivariate Influent Prediction in Wastewater Treatment Plants","authors":"Ziqing Ye,&nbsp;Qilin Wang,&nbsp;Yiqi Liu","doi":"10.1021/acsestwater.6c00503","DOIUrl":null,"url":null,"abstract":"<p>Accurate\r\nforecasting of influent flow rates and water\r\nquality is\r\nof great importance to facilitate wastewater treatment plants (WWTPs)\r\ntowards early fault warning and optimal operations. However, due to\r\nthe seasonality, complex multivariate nexus and inherent disturbances,\r\nthe predictive performance of WWTP influent is often unsatisfactory,\r\nparticularly for multistep forecasting. This limitation usually frustrates\r\nthe practical utility of such models for operational guidance and\r\ndecision-making. To address these challenges, this study proposes\r\na Transformer-based forecasting framework called Exformer. The framework\r\nemploys a Channel-Independent (CI) representation strategy to preserve\r\nvariable-specific temporal characteristics and reduce cross-variable\r\ninterference. In addition, a Temporal Knowledge Guided Attention (TKGA)\r\nmechanism incorporates temporal prior knowledge into the attention\r\nprocess to enhance long-range dependency modeling. The proposed framework\r\nis evaluated on both the Benchmark Simulation Model No.2 (BSM2) dataset\r\nand a real-world WWTP dataset collected from Dongguan, China, under\r\nforecasting horizons of 6, 12, 24, and 48 steps. The experimental\r\nresults show that Exformer delivers competitive performance across\r\ndifferent forecasting horizons, with increasingly pronounced advantages\r\nat longer horizons, particularly at 24 and 48 steps. Additional robustness,\r\ninterpretability, reliability and ablation analyses further demonstrate\r\nthe effectiveness of Exformer for practical wastewater influent forecasting\r\napplications.</p>","PeriodicalId":93847,"journal":{"name":"ACS ES&T water","volume":"6 10","pages":"6374–6390"},"PeriodicalIF":4.5000,"publicationDate":"2026-10-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"ACS ES&T water","FirstCategoryId":"1085","ListUrlMain":"https://pubs.acs.org/doi/10.1021/acsestwater.6c00503","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"2026/9/30 0:00:00","PubModel":"Epub","JCR":"Q1","JCRName":"ENVIRONMENTAL SCIENCES","Score":null,"Total":0}
引用次数: 0

Abstract

Accurate forecasting of influent flow rates and water quality is of great importance to facilitate wastewater treatment plants (WWTPs) towards early fault warning and optimal operations. However, due to the seasonality, complex multivariate nexus and inherent disturbances, the predictive performance of WWTP influent is often unsatisfactory, particularly for multistep forecasting. This limitation usually frustrates the practical utility of such models for operational guidance and decision-making. To address these challenges, this study proposes a Transformer-based forecasting framework called Exformer. The framework employs a Channel-Independent (CI) representation strategy to preserve variable-specific temporal characteristics and reduce cross-variable interference. In addition, a Temporal Knowledge Guided Attention (TKGA) mechanism incorporates temporal prior knowledge into the attention process to enhance long-range dependency modeling. The proposed framework is evaluated on both the Benchmark Simulation Model No.2 (BSM2) dataset and a real-world WWTP dataset collected from Dongguan, China, under forecasting horizons of 6, 12, 24, and 48 steps. The experimental results show that Exformer delivers competitive performance across different forecasting horizons, with increasingly pronounced advantages at longer horizons, particularly at 24 and 48 steps. Additional robustness, interpretability, reliability and ablation analyses further demonstrate the effectiveness of Exformer for practical wastewater influent forecasting applications.

转换器:一种基于变压器的多步骤多变量污水处理厂进水预测的时间知识辅助预测框架
准确预测进水流量和水质对污水处理厂的早期故障预警和优化运行具有重要意义。然而,由于季节性、复杂的多元关系和内在干扰,污水处理厂流量的预测效果往往不理想,特别是在多步骤预测中。这种限制通常会阻碍这些模型在操作指导和决策方面的实际应用。为了应对这些挑战,本研究提出了一个基于transformer的预测框架,称为Exformer。该框架采用信道独立(CI)表示策略来保留变量特定的时间特征并减少交叉变量干扰。此外,时间知识引导注意(TKGA)机制将时间先验知识引入到注意过程中,以增强远程依赖建模。该框架在基准模拟模型2 (BSM2)数据集和从中国东莞收集的真实世界污水处理厂数据集上进行了评估,低估了6、12、24和48步的水平。实验结果表明,Exformer在不同的预测范围内都具有竞争力,在更长的预测范围内,尤其是在24步和48步时,优势越来越明显。额外的稳健性、可解释性、可靠性和烧蚀分析进一步证明了Exformer在实际废水预测应用中的有效性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
CiteScore
5.40
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信
小红书