{"title":"Computing-Electricity-Water Synergy-Based Expansion Planning of Sustainable Data Center","authors":"Yingping Cao;Kuan Zhang;Ziqiang Wang;Chaojie Li;Hong Tan;Yi Yu;Chi Yung Chung","doi":"10.1109/TIA.2026.3654508","DOIUrl":null,"url":null,"abstract":"This paper proposes a stochastic-robust computing-electricity-water planning strategy for the cost-effective deployment of sustainable data centers (DCs). This strategy not only considers the tight coupling interactions of energy, workload and water flow to meet dynamic service requirements of DCs, but also can co-optimize the investment decisions related to electricity and water delivery network expansions to mitigate long-term siting risks. Moreover, a temperature-aware power and water demand model is proposed to enhance operational flexibility in DC expansion planning, and a modified thermodynamic formulation of DCs is formulated to explore the interdependencies between electricity and cooling water demands of DCs on ambient temperature fluctuations by integrating a variable resistor. To address the fact that higher computing capacities of DCs will attract more workloads, a stochastic-robust programming approach is employed, which considers both decision-independent uncertainties from renewable generation, electricity load and water consumption, as well as demand-induced uncertainties related to investment behaviors. Furthermore, a Parametric Column-and-Constraint Generation (PC&CG) algorithm with multiple linearization techniques is presented to alleviate the computational complexity of the original DC planning problem and quantitatively assess demand-driven workload uncertainties. Simulation results validate the effectiveness of the proposed strategy in achieving an economical investment portfolio of sustainable DCs.","PeriodicalId":13337,"journal":{"name":"IEEE Transactions on Industry Applications","volume":"62 5","pages":"8586-8598"},"PeriodicalIF":5.2000,"publicationDate":"2026-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"IEEE Transactions on Industry Applications","FirstCategoryId":"5","ListUrlMain":"https://ieeexplore.ieee.org/document/11355926/","RegionNum":2,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"2026/1/16 0:00:00","PubModel":"Epub","JCR":"Q2","JCRName":"ENGINEERING, ELECTRICAL & ELECTRONIC","Score":null,"Total":0}
引用次数: 0

Abstract

This paper proposes a stochastic-robust computing-electricity-water planning strategy for the cost-effective deployment of sustainable data centers (DCs). This strategy not only considers the tight coupling interactions of energy, workload and water flow to meet dynamic service requirements of DCs, but also can co-optimize the investment decisions related to electricity and water delivery network expansions to mitigate long-term siting risks. Moreover, a temperature-aware power and water demand model is proposed to enhance operational flexibility in DC expansion planning, and a modified thermodynamic formulation of DCs is formulated to explore the interdependencies between electricity and cooling water demands of DCs on ambient temperature fluctuations by integrating a variable resistor. To address the fact that higher computing capacities of DCs will attract more workloads, a stochastic-robust programming approach is employed, which considers both decision-independent uncertainties from renewable generation, electricity load and water consumption, as well as demand-induced uncertainties related to investment behaviors. Furthermore, a Parametric Column-and-Constraint Generation (PC&CG) algorithm with multiple linearization techniques is presented to alleviate the computational complexity of the original DC planning problem and quantitatively assess demand-driven workload uncertainties. Simulation results validate the effectiveness of the proposed strategy in achieving an economical investment portfolio of sustainable DCs.
基于计算-电-水协同的可持续数据中心扩展规划
本文提出了一种随机鲁棒计算-电-水规划策略,以实现可持续数据中心(DCs)的经济高效部署。该策略不仅考虑了能源、工作量和水流的紧密耦合相互作用,以满足数据中心的动态服务需求,而且可以共同优化与电力和水输送网络扩展相关的投资决策,以降低长期选址风险。此外,提出了一个温度感知的电力和水需求模型,以提高直流扩展规划的操作灵活性,并制定了一个改进的直流系统热力学公式,通过集成可变电阻来探索直流系统的电力和冷却水需求与环境温度波动的相互依赖关系。为了解决数据中心较高的计算能力将吸引更多工作负载的问题,采用了一种随机鲁棒规划方法,该方法既考虑了来自可再生能源发电、电力负荷和水消耗的决策独立不确定性,也考虑了与投资行为相关的需求诱导不确定性。在此基础上,提出了一种采用多种线性化技术的参数化列约束生成算法(PC&CG),以减轻原有直流规划问题的计算复杂度,并定量评估需求驱动的工作负荷不确定性。仿真结果验证了该策略在实现可持续发展DCs的经济投资组合方面的有效性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
IEEE Transactions on Industry Applications
IEEE Transactions on Industry Applications 工程技术-工程:电子与电气
CiteScore
9.90
自引率
9.10%
发文量
747
审稿时长
3.3 months
期刊介绍: The scope of the IEEE Transactions on Industry Applications includes all scope items of the IEEE Industry Applications Society, that is, the advancement of the theory and practice of electrical and electronic engineering in the development, design, manufacture, and application of electrical systems, apparatus, devices, and controls to the processes and equipment of industry and commerce; the promotion of safe, reliable, and economic installations; industry leadership in energy conservation and environmental, health, and safety issues; the creation of voluntary engineering standards and recommended practices; and the professional development of its membership.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信
小红书