A Novel Ice-Plug Temporary Sealing Structural System for Deep Outlet Facilities: From Engineering Concept to Feasibility Assessment

IF 5 2区 工程技术 Q1 CONSTRUCTION & BUILDING TECHNOLOGY
Cao Xiangyu, Tang Yunqing, Qian Long, Liu Haixiang, Hu Songdi, Chen Xining, Gao Panfeng, Ke Minyong
{"title":"A Novel Ice-Plug Temporary Sealing Structural System for Deep Outlet Facilities: From Engineering Concept to Feasibility Assessment","authors":"Cao Xiangyu,&nbsp;Tang Yunqing,&nbsp;Qian Long,&nbsp;Liu Haixiang,&nbsp;Hu Songdi,&nbsp;Chen Xining,&nbsp;Gao Panfeng,&nbsp;Ke Minyong","doi":"10.1155/stc/5778852","DOIUrl":null,"url":null,"abstract":"<p>High-head deep outlets require temporary sealing methods that are reversible, rapidly deployable and mechanically reliable. This study proposes a novel in situ ice-plug structural system in which tunnel water upstream of the gate is frozen to form a temporary barrier, while the ice plug, concrete lining and surrounding rock act as a confined composite system to resist hydrostatic loading. The system is characterised as a load-transfer and stability problem governed jointly by ice compression, interfacial shear, lateral confinement and plug geometry, rather than by ice strength alone. The feasibility of the concept is evaluated through an analytical equilibrium formulation, two-stage physical model tests and complementary three-dimensional heat-transfer and nonlinear mechanical simulations. The tests demonstrate controllable condenser-pipe ice formation and provide pressure–displacement data for equivalent-parameter calibration, while identifying end sealing and ice–lining contact as critical constraints. Heat-transfer analysis shows that convection at the ice–water interface dominates cold-energy loss, whereas conduction into the lining and surrounding rock is secondary. Mechanical analyses reveal a predominantly compressive stress state and show that antisliding capacity is controlled primarily by interfacial resistance, surrounding-rock confinement and the plug length-to-diameter ratio. Under the adopted conditions, <i>L</i>/<i>D</i> = 0.4 is suggested as a preliminary lower bound for heads not exceeding 100 m. These findings clarify the governing thermal and mechanical mechanisms of the ice-plug–lining–rock system and provide a theoretical basis for preliminary design and further field-scale assessment.</p>","PeriodicalId":49471,"journal":{"name":"Structural Control & Health Monitoring","volume":"2026 1","pages":""},"PeriodicalIF":5.0000,"publicationDate":"2026-09-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://onlinelibrary.wiley.com/doi/epdf/10.1155/stc/5778852","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Structural Control & Health Monitoring","FirstCategoryId":"5","ListUrlMain":"https://onlinelibrary.wiley.com/doi/10.1155/stc/5778852","RegionNum":2,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"CONSTRUCTION & BUILDING TECHNOLOGY","Score":null,"Total":0}
引用次数: 0

Abstract

High-head deep outlets require temporary sealing methods that are reversible, rapidly deployable and mechanically reliable. This study proposes a novel in situ ice-plug structural system in which tunnel water upstream of the gate is frozen to form a temporary barrier, while the ice plug, concrete lining and surrounding rock act as a confined composite system to resist hydrostatic loading. The system is characterised as a load-transfer and stability problem governed jointly by ice compression, interfacial shear, lateral confinement and plug geometry, rather than by ice strength alone. The feasibility of the concept is evaluated through an analytical equilibrium formulation, two-stage physical model tests and complementary three-dimensional heat-transfer and nonlinear mechanical simulations. The tests demonstrate controllable condenser-pipe ice formation and provide pressure–displacement data for equivalent-parameter calibration, while identifying end sealing and ice–lining contact as critical constraints. Heat-transfer analysis shows that convection at the ice–water interface dominates cold-energy loss, whereas conduction into the lining and surrounding rock is secondary. Mechanical analyses reveal a predominantly compressive stress state and show that antisliding capacity is controlled primarily by interfacial resistance, surrounding-rock confinement and the plug length-to-diameter ratio. Under the adopted conditions, L/D = 0.4 is suggested as a preliminary lower bound for heads not exceeding 100 m. These findings clarify the governing thermal and mechanical mechanisms of the ice-plug–lining–rock system and provide a theoretical basis for preliminary design and further field-scale assessment.

一种新型的深出口设施冰塞临时密封结构体系:从工程概念到可行性评估
高水头深出口需要临时密封方法,这种方法是可逆的、可快速部署的、机械可靠的。本研究提出了一种新颖的原位冰塞结构系统,在该系统中,闸门上游的隧道水被冻结形成临时屏障,而冰塞、混凝土衬砌和围岩作为一个受约束的复合系统来抵抗静水荷载。该系统的特点是由冰压缩、界面剪切、侧向约束和塞的几何形状共同控制的载荷传递和稳定性问题,而不仅仅是冰的强度。通过分析平衡公式、两阶段物理模型试验以及互补的三维传热和非线性力学模拟来评估该概念的可行性。试验证明了冷凝器管结冰是可控的,并为等效参数校准提供了压力-位移数据,同时确定了末端密封和冰衬里接触是关键约束条件。换热分析表明,冷能损失主要以冰水界面的对流损失为主,衬砌和围岩的传导损失次之。力学分析表明,桥塞主要处于压应力状态,抗滑能力主要由界面阻力、围岩约束和桥塞长径比控制。在此条件下,建议L/D = 0.4作为水头不超过100 m的初步下界。这些发现阐明了冰塞-岩石体系的热力学控制机制,为初步设计和进一步的现场规模评价提供了理论依据。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
Structural Control & Health Monitoring
Structural Control & Health Monitoring 工程技术-工程:土木
CiteScore
9.50
自引率
13.00%
发文量
234
审稿时长
8 months
期刊介绍: The Journal Structural Control and Health Monitoring encompasses all theoretical and technological aspects of structural control, structural health monitoring theory and smart materials and structures. The journal focuses on aerospace, civil, infrastructure and mechanical engineering applications. Original contributions based on analytical, computational and experimental methods are solicited in three main areas: monitoring, control, and smart materials and structures, covering subjects such as system identification, health monitoring, health diagnostics, multi-functional materials, signal processing, sensor technology, passive, active and semi active control schemes and implementations, shape memory alloys, piezoelectrics and mechatronics. Also of interest are actuator design, dynamic systems, dynamic stability, artificial intelligence tools, data acquisition, wireless communications, measurements, MEMS/NEMS sensors for local damage detection, optical fibre sensors for health monitoring, remote control of monitoring systems, sensor-logger combinations for mobile applications, corrosion sensors, scour indicators and experimental techniques.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信
小红书