Waste collection fleet and operational cost under final disposal site (TPA) relocation crisis: a multi-scenario analysis for South Tangerang City, Indonesia
{"title":"Waste collection fleet and operational cost under final disposal site (TPA) relocation crisis: a multi-scenario analysis for South Tangerang City, Indonesia","authors":"Machmuddin Fitra Miftahadi, Indriyani Rachman, Toru Matsumoto","doi":"10.1007/s10163-026-02696-z","DOIUrl":null,"url":null,"abstract":"<div><p>The closure of the Cipeucang final disposal site (TPA) on 8 December 2025 triggered a waste-management crisis in South Tangerang City (Tangsel), a Jakarta satellite city generating about 1,100 tonnes of municipal solid waste per day. Building on a previously validated and optimised collection network, this study evaluates four post-closure relocation scenarios in terms of fleet size, round-trip frequency, fuel use, and operational cost. SC1 is the closed baseline (≈ 5 km haul to Cipeucang, reference only). SC2 routes all waste to TPSA Cilowong, Serang (≈ 65 km), reflecting the operational reality of 120 t/d carried by 30 trucks by February 2026. SC3 routes all waste to TPA Bangkonol, Pandeglang (≈ 82 km). SC4 is a 50:50 hybrid split between Cilowong and Bangkonol. The analysis shows that moving from SC1 to SC3 raises the annual operating cost by about 325% (from USD 0.90 million to USD 3.81 million per year) and reduces the effective round trips per truck per day from 2.3 to 0.6, forcing a 3.8-fold fleet expansion from 62 to 235 trucks to maintain the existing 367.5 t/d collection coverage; the SC4 hybrid requires 173 trucks (a 2.8-fold expansion). Among the long-haul options, SC4 offers the most robust per-tonne cost when both sites must be used, although routing all waste to the nearer Cilowong site (SC2) is the lowest-cost single-destination option. A transfer-station architecture (SC3+/SC4+) cuts the required fleet-expansion capital by 70–80%. These findings show that the four-year Rp 190.8 billion Bangkonol transport budget omits the transport operating cost (about 57% of the budget) and provide a transferable framework for the many Indonesian cities that must relocate their disposal sites under the national open-dumping closure mandate.</p></div>","PeriodicalId":643,"journal":{"name":"Journal of Material Cycles and Waste Management","volume":"28 5","pages":"4688 - 4699"},"PeriodicalIF":3.8000,"publicationDate":"2026-08-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Material Cycles and Waste Management","FirstCategoryId":"93","ListUrlMain":"https://link.springer.com/article/10.1007/s10163-026-02696-z","RegionNum":4,"RegionCategory":"环境科学与生态学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"ENVIRONMENTAL SCIENCES","Score":null,"Total":0}
引用次数: 0
Abstract
The closure of the Cipeucang final disposal site (TPA) on 8 December 2025 triggered a waste-management crisis in South Tangerang City (Tangsel), a Jakarta satellite city generating about 1,100 tonnes of municipal solid waste per day. Building on a previously validated and optimised collection network, this study evaluates four post-closure relocation scenarios in terms of fleet size, round-trip frequency, fuel use, and operational cost. SC1 is the closed baseline (≈ 5 km haul to Cipeucang, reference only). SC2 routes all waste to TPSA Cilowong, Serang (≈ 65 km), reflecting the operational reality of 120 t/d carried by 30 trucks by February 2026. SC3 routes all waste to TPA Bangkonol, Pandeglang (≈ 82 km). SC4 is a 50:50 hybrid split between Cilowong and Bangkonol. The analysis shows that moving from SC1 to SC3 raises the annual operating cost by about 325% (from USD 0.90 million to USD 3.81 million per year) and reduces the effective round trips per truck per day from 2.3 to 0.6, forcing a 3.8-fold fleet expansion from 62 to 235 trucks to maintain the existing 367.5 t/d collection coverage; the SC4 hybrid requires 173 trucks (a 2.8-fold expansion). Among the long-haul options, SC4 offers the most robust per-tonne cost when both sites must be used, although routing all waste to the nearer Cilowong site (SC2) is the lowest-cost single-destination option. A transfer-station architecture (SC3+/SC4+) cuts the required fleet-expansion capital by 70–80%. These findings show that the four-year Rp 190.8 billion Bangkonol transport budget omits the transport operating cost (about 57% of the budget) and provide a transferable framework for the many Indonesian cities that must relocate their disposal sites under the national open-dumping closure mandate.
期刊介绍:
The Journal of Material Cycles and Waste Management has a twofold focus: research in technical, political, and environmental problems of material cycles and waste management; and information that contributes to the development of an interdisciplinary science of material cycles and waste management. Its aim is to develop solutions and prescriptions for material cycles.
The journal publishes original articles, reviews, and invited papers from a wide range of disciplines related to material cycles and waste management.
The journal is published in cooperation with the Japan Society of Material Cycles and Waste Management (JSMCWM) and the Korea Society of Waste Management (KSWM).