Fuquan Ding , Huajie Liu , Zhongguang Liu , Yuhuan Bu , Hongxu Zhang , Hui Yin
{"title":"Analysis of the effect of steam injection conditions on the integrity of casing-cement sheath-formation assemblies in heavy oil thermal recovery","authors":"Fuquan Ding , Huajie Liu , Zhongguang Liu , Yuhuan Bu , Hongxu Zhang , Hui Yin","doi":"10.1016/j.petlm.2026.04.002","DOIUrl":null,"url":null,"abstract":"<div><div>Accurately forecasting the sealing failure behavior of the casing-cement sheath-formation assembly under various steam injection operational parameters and cyclic steam stimulation conditions remains challenging. Such unpredictability heightens the risk of seal integrity compromise in the wellbores of thermal heavy oil production. This paper develops a numerical simulation and analytical approach based on heat-fluid-solid interactions within the casing-cement sheath-formation system. It assesses the impact of potential cement sheath and interfacial failures in response to differing steam injection pressures, temperatures, injection rates, and cyclic steam volumes. This assessment leverages the established relationships between the temperature-dependent elastic modulus and Poisson’s ratio of cementitious materials, as well as the dynamics of wellbore pressure, temperature, and steam quality during steam injection. Experimental findings suggest that maintaining steam injection temperatures between 340 °C and 380 °C can effectively mitigate the risk of shear-induced damage and enhance the safety of the cementing interface. The injection rate appears to have a minimal impact on interface integrity. The extent of plastic strain in the cement sheath is proportionate to the size of the micro-annular gap at the interface. When the initial formation has an elastic modulus of 15 GPa, variations in the cement sheath’s elastic modulus do not influence the micro-annular gap size. However, in formations with an initial elastic modulus of 5 GPa, a lower elastic modulus of the cement sheath corresponds to a smaller micro-annular gap. The study concludes that a higher initial geostress and temperature, coupled with a high elastic modulus of the surrounding strata, are conducive to maintaining the integrity of the cement sheath interface.</div></div>","PeriodicalId":37433,"journal":{"name":"Petroleum","volume":"12 2","pages":"Pages 323-338"},"PeriodicalIF":5.5000,"publicationDate":"2026-04-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Petroleum","FirstCategoryId":"1087","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S2405656126000271","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"2026/4/10 0:00:00","PubModel":"Epub","JCR":"Q2","JCRName":"ENERGY & FUELS","Score":null,"Total":0}
引用次数: 0
Abstract
Accurately forecasting the sealing failure behavior of the casing-cement sheath-formation assembly under various steam injection operational parameters and cyclic steam stimulation conditions remains challenging. Such unpredictability heightens the risk of seal integrity compromise in the wellbores of thermal heavy oil production. This paper develops a numerical simulation and analytical approach based on heat-fluid-solid interactions within the casing-cement sheath-formation system. It assesses the impact of potential cement sheath and interfacial failures in response to differing steam injection pressures, temperatures, injection rates, and cyclic steam volumes. This assessment leverages the established relationships between the temperature-dependent elastic modulus and Poisson’s ratio of cementitious materials, as well as the dynamics of wellbore pressure, temperature, and steam quality during steam injection. Experimental findings suggest that maintaining steam injection temperatures between 340 °C and 380 °C can effectively mitigate the risk of shear-induced damage and enhance the safety of the cementing interface. The injection rate appears to have a minimal impact on interface integrity. The extent of plastic strain in the cement sheath is proportionate to the size of the micro-annular gap at the interface. When the initial formation has an elastic modulus of 15 GPa, variations in the cement sheath’s elastic modulus do not influence the micro-annular gap size. However, in formations with an initial elastic modulus of 5 GPa, a lower elastic modulus of the cement sheath corresponds to a smaller micro-annular gap. The study concludes that a higher initial geostress and temperature, coupled with a high elastic modulus of the surrounding strata, are conducive to maintaining the integrity of the cement sheath interface.
期刊介绍:
Examples of appropriate topical areas that will be considered include the following: 1.comprehensive research on oil and gas reservoir (reservoir geology): -geological basis of oil and gas reservoirs -reservoir geochemistry -reservoir formation mechanism -reservoir identification methods and techniques 2.kinetics of oil and gas basins and analyses of potential oil and gas resources: -fine description factors of hydrocarbon accumulation -mechanism analysis on recovery and dynamic accumulation process -relationship between accumulation factors and the accumulation process -analysis of oil and gas potential resource 3.theories and methods for complex reservoir geophysical prospecting: -geophysical basis of deep geologic structures and background of hydrocarbon occurrence -geophysical prediction of deep and complex reservoirs -physical test analyses and numerical simulations of reservoir rocks -anisotropic medium seismic imaging theory and new technology for multiwave seismic exploration -o theories and methods for reservoir fluid geophysical identification and prediction 4.theories, methods, technology, and design for complex reservoir development: -reservoir percolation theory and application technology -field development theories and methods -theory and technology for enhancing recovery efficiency 5.working liquid for oil and gas wells and reservoir protection technology: -working chemicals and mechanics for oil and gas wells -reservoir protection technology 6.new techniques and technologies for oil and gas drilling and production: -under-balanced drilling/gas drilling -special-track well drilling -cementing and completion of oil and gas wells -engineering safety applications for oil and gas wells -new technology of fracture acidizing