Study on pressure variation and its impact on the essential service water system of nuclear power plants

Lv Li , Yanyu Yang , Sheng Yan , Xiaolong He , Jiayue Chen , Rongyan Huang , Hong Xu
{"title":"Study on pressure variation and its impact on the essential service water system of nuclear power plants","authors":"Lv Li ,&nbsp;Yanyu Yang ,&nbsp;Sheng Yan ,&nbsp;Xiaolong He ,&nbsp;Jiayue Chen ,&nbsp;Rongyan Huang ,&nbsp;Hong Xu","doi":"10.1016/j.jandt.2025.10.003","DOIUrl":null,"url":null,"abstract":"<div><div>The Essential Service Water (SEC) system of the CPR1000 unit serves as the ultimate heat sink for the nuclear island system of the power plant. Its distinctive redundant configuration (with standby trains configured) gives rise to specific operational transients, which may induce water hammer phenomena. To investigate this issue, this paper establishes six typical operating conditions of the SEC system using the one-dimensional thermal hydraulic system code RELAP5. It conducts a comparative study on (1) the impact of the operating status of the standby pump on water hammer during startup and shutdown transients, and (2) the impact of gas accumulation in the horizontal pipe after the pump on transient water hammer pressure and the system. The findings demonstrate that pump commissioning triggers nonlinear water hammer effects, and the pressure peaks do not follow a linear superposition principle. Of particular significance, gas accumulation acts as a primary risk amplifier, which notably exacerbates pressure oscillations and elevates pressure peak magnitudes. This research provides critical insights and empirical evidence for optimizing the operational strategy of the SEC system and mitigating water hammer risks, thereby safeguarding the reliability of the ultimate heat sink of CPR1000.</div></div>","PeriodicalId":100689,"journal":{"name":"International Journal of Advanced Nuclear Reactor Design and Technology","volume":"7 4","pages":"Pages 415-422"},"PeriodicalIF":0.0000,"publicationDate":"2025-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Advanced Nuclear Reactor Design and Technology","FirstCategoryId":"1085","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S2468605025001036","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"2025/10/14 0:00:00","PubModel":"Epub","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The Essential Service Water (SEC) system of the CPR1000 unit serves as the ultimate heat sink for the nuclear island system of the power plant. Its distinctive redundant configuration (with standby trains configured) gives rise to specific operational transients, which may induce water hammer phenomena. To investigate this issue, this paper establishes six typical operating conditions of the SEC system using the one-dimensional thermal hydraulic system code RELAP5. It conducts a comparative study on (1) the impact of the operating status of the standby pump on water hammer during startup and shutdown transients, and (2) the impact of gas accumulation in the horizontal pipe after the pump on transient water hammer pressure and the system. The findings demonstrate that pump commissioning triggers nonlinear water hammer effects, and the pressure peaks do not follow a linear superposition principle. Of particular significance, gas accumulation acts as a primary risk amplifier, which notably exacerbates pressure oscillations and elevates pressure peak magnitudes. This research provides critical insights and empirical evidence for optimizing the operational strategy of the SEC system and mitigating water hammer risks, thereby safeguarding the reliability of the ultimate heat sink of CPR1000.
核电站基本给水系统压力变化及其影响研究
CPR1000机组的基本服务水(SEC)系统是核电站核岛系统的最终散热器。其独特的冗余配置(配备备用列车)会产生特定的运行瞬变,这可能导致水锤现象。为了研究这一问题,本文采用一维热液系统代码RELAP5建立了SEC系统的六种典型工况。对比研究了(1)备用泵运行状态对启动和关闭瞬态水锤的影响,(2)泵后水平管内气体积聚对瞬态水锤压力和系统的影响。研究结果表明,水泵调试触发了非线性水锤效应,压力峰值不遵循线性叠加原则。特别重要的是,天然气聚集是一个主要的风险放大器,它显著加剧了压力振荡,提高了压力峰值的幅度。本研究为优化SEC系统运行策略,降低水锤风险,从而保障CPR1000终极散热器的可靠性提供了重要的见解和经验证据。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
CiteScore
2.50
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信
小红书