Obtaining day-of-surgery written surgical consent is associated with first-case delay.

IF 0.9 Q3 SURGERY
Journal of perioperative practice Pub Date : 2026-07-01 Epub Date: 2025-10-15 DOI:10.1177/17504589251377667
Victoria Yin, Tsehay B Abebe, Li Ding, Scott M Atay, Takashi Harano, Anthony W Kim, Baddr A Shakhsheer, Sean C Wightman
{"title":"Obtaining day-of-surgery written surgical consent is associated with first-case delay.","authors":"Victoria Yin, Tsehay B Abebe, Li Ding, Scott M Atay, Takashi Harano, Anthony W Kim, Baddr A Shakhsheer, Sean C Wightman","doi":"10.1177/17504589251377667","DOIUrl":null,"url":null,"abstract":"<p><strong>Objective: </strong>To assess the relationship between consent signature timing and first-start case delay.</p><p><strong>Study design: </strong>Consecutive first start patients who arrived on day-of-surgery from home at a single centre from 28 days in June 2021 were identified. First-case delay was defined as operating theatre (OT) in-room time greater than 5 minutes after scheduled start time.</p><p><strong>Results: </strong>A total of 289 patients were eligible for the study. Surgical consent signing in the preoperative area and non-English primary language were significantly associated with OT delay; 234 patients (81%) had signed surgical consent on the day of surgery in the preoperative area. Patients who signed surgical consent on day- of- surgery were 3.2 times as likely to experience OT in-room time delay compared to those who signed surgical consent prior to day of surgery, odds ratio (OR) 3.2, 95% confidence interval (CI): 1.2, 8.5, <i>p</i> = 0.02. Patients with non-English primary language had 3.8 times greater risk for case delay (OR 3.8, 95% CI: 2.0, 7.4, <i>p</i> < 0.0001).</p><p><strong>Conclusion: </strong>Same day consent signing among patients arriving for surgery from home may cause significant operating theatre start time delays. In addition to ethical reasons, obtaining consent in the preoperative area should be avoided to improve preoperative efficiency.</p>","PeriodicalId":35481,"journal":{"name":"Journal of perioperative practice","volume":" ","pages":"413-417"},"PeriodicalIF":0.9000,"publicationDate":"2026-07-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of perioperative practice","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1177/17504589251377667","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"2025/10/15 0:00:00","PubModel":"Epub","JCR":"Q3","JCRName":"SURGERY","Score":null,"Total":0}
引用次数: 0

Abstract

Objective: To assess the relationship between consent signature timing and first-start case delay.

Study design: Consecutive first start patients who arrived on day-of-surgery from home at a single centre from 28 days in June 2021 were identified. First-case delay was defined as operating theatre (OT) in-room time greater than 5 minutes after scheduled start time.

Results: A total of 289 patients were eligible for the study. Surgical consent signing in the preoperative area and non-English primary language were significantly associated with OT delay; 234 patients (81%) had signed surgical consent on the day of surgery in the preoperative area. Patients who signed surgical consent on day- of- surgery were 3.2 times as likely to experience OT in-room time delay compared to those who signed surgical consent prior to day of surgery, odds ratio (OR) 3.2, 95% confidence interval (CI): 1.2, 8.5, p = 0.02. Patients with non-English primary language had 3.8 times greater risk for case delay (OR 3.8, 95% CI: 2.0, 7.4, p < 0.0001).

Conclusion: Same day consent signing among patients arriving for surgery from home may cause significant operating theatre start time delays. In addition to ethical reasons, obtaining consent in the preoperative area should be avoided to improve preoperative efficiency.

获得手术当天的书面手术同意与首例延迟有关。
目的:探讨同意签字时间与首发病例延迟的关系。研究设计:确定了2021年6月28天内从家中到单一中心手术当日到达的连续首次就诊患者。首次病例延迟定义为手术室(OT)在房间内的时间比预定开始时间晚了5分钟。结果:共有289例患者符合研究条件。术前区域和非英语主要语言的手术同意书签署与OT延迟显著相关;234例(81%)患者于手术当日在术前区签署手术同意书。与术前签署手术同意书的患者相比,在手术当天签署手术同意书的患者发生手术室时间延迟的可能性是后者的3.2倍,优势比(OR)为3.2,95%可信区间(CI)为1.2,8.5,p = 0.02。非英语为主语言的患者病例延迟的风险是其他患者的3.8倍(OR 3.8, 95% CI: 2.0, 7.4, p)。结论:从家中到达手术的患者在同一天签署同意书可能会导致明显的手术室开始时间延迟。除伦理原因外,应避免在术前区域取得同意,以提高手术效率。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
Journal of perioperative practice
Journal of perioperative practice Nursing-Medical and Surgical Nursing
CiteScore
1.60
自引率
0.00%
发文量
59
期刊介绍: The Journal of Perioperative Practice (JPP) is the official journal of the Association for Perioperative Practice (AfPP). It is an international, peer reviewed journal with a multidisciplinary ethos across all aspects of perioperative care. The overall aim of the journal is to improve patient safety through informing and developing practice. It is an informative professional journal which provides current evidence-based practice, clinical, management and educational developments for practitioners working in the perioperative environment. The journal promotes perioperative practice by publishing clinical research-based articles, literature reviews, topical discussions, advice on clinical issues, current news items and product information.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信
小红书