{"title":"Adaptive hybrid optimization for integrated project scheduling and staffing problem with time/resource trade-offs","authors":"Muhai Hu , Yao Wang , Wendi Tian","doi":"10.1016/j.orp.2025.100346","DOIUrl":null,"url":null,"abstract":"<div><div>The integration of project scheduling and human resource allocation is crucial in modern project management, particularly in complex and resource-constrained environments. This study addresses the Integrated Project Scheduling and Personnel Staffing Problem (IPSPSP) with time/resource trade-offs by proposing a dual-objective optimization model that minimizes both project duration and personnel cost. To solve this problem, we introduce an adaptive hybrid algorithm combining the Non-dominated Sorting Genetic Algorithm II (NSGA-II) and Multi-Objective Particle Swarm Optimization (MOPSO). The algorithm employs hybrid encoding for activity modes, activity priority lists and personnel allocation plans, coupled with a hypervolume-based adaptive search mechanism to improve solution quality. Experimental results demonstrate that the adaptive hybrid algorithm outperforms standalone NSGA-II and MOPSO in generating schedules and optimizing resource allocation. This study makes significant contributions by presenting a novel integrated model tailored for projects, an effective adaptive hybrid optimization algorithm and a comprehensive performance evaluation, thereby advancing the field of integrated scheduling and staffing in project management.</div></div>","PeriodicalId":38055,"journal":{"name":"Operations Research Perspectives","volume":"15 ","pages":"Article 100346"},"PeriodicalIF":3.7000,"publicationDate":"2025-06-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Operations Research Perspectives","FirstCategoryId":"91","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S2214716025000223","RegionNum":4,"RegionCategory":"管理学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"OPERATIONS RESEARCH & MANAGEMENT SCIENCE","Score":null,"Total":0}
引用次数: 0
Abstract
The integration of project scheduling and human resource allocation is crucial in modern project management, particularly in complex and resource-constrained environments. This study addresses the Integrated Project Scheduling and Personnel Staffing Problem (IPSPSP) with time/resource trade-offs by proposing a dual-objective optimization model that minimizes both project duration and personnel cost. To solve this problem, we introduce an adaptive hybrid algorithm combining the Non-dominated Sorting Genetic Algorithm II (NSGA-II) and Multi-Objective Particle Swarm Optimization (MOPSO). The algorithm employs hybrid encoding for activity modes, activity priority lists and personnel allocation plans, coupled with a hypervolume-based adaptive search mechanism to improve solution quality. Experimental results demonstrate that the adaptive hybrid algorithm outperforms standalone NSGA-II and MOPSO in generating schedules and optimizing resource allocation. This study makes significant contributions by presenting a novel integrated model tailored for projects, an effective adaptive hybrid optimization algorithm and a comprehensive performance evaluation, thereby advancing the field of integrated scheduling and staffing in project management.