Research on double deck beam closure construction based on hanging beam on arch technology

ce/papers Pub Date : 2025-03-18 DOI:10.1002/cepa.3208
Yexun Li, Laifa Wang, Qianqian Liang
{"title":"Research on double deck beam closure construction based on hanging beam on arch technology","authors":"Yexun Li,&nbsp;Laifa Wang,&nbsp;Qianqian Liang","doi":"10.1002/cepa.3208","DOIUrl":null,"url":null,"abstract":"<p>This paper established the construction calculation model of the whole bridge through Midas Civil software, and analyzed the mechanical response of the whole and horizontal cables in the construction process in detail. It verified the feasibility and safety of the construction process of “lifting beams on the arch and lifting the bridge deck as a whole in double decks”. The monitoring method, the deviation adjustment technology of the closure opening and the fine-tuning strategy of the top pulling device were proposed to ensure the accuracy of the closure during the bridge deck closure construction of Qingshuitang Bridge.</p>","PeriodicalId":100223,"journal":{"name":"ce/papers","volume":"8 2","pages":"1194-1202"},"PeriodicalIF":0.0000,"publicationDate":"2025-03-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"ce/papers","FirstCategoryId":"1085","ListUrlMain":"https://onlinelibrary.wiley.com/doi/10.1002/cepa.3208","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

This paper established the construction calculation model of the whole bridge through Midas Civil software, and analyzed the mechanical response of the whole and horizontal cables in the construction process in detail. It verified the feasibility and safety of the construction process of “lifting beams on the arch and lifting the bridge deck as a whole in double decks”. The monitoring method, the deviation adjustment technology of the closure opening and the fine-tuning strategy of the top pulling device were proposed to ensure the accuracy of the closure during the bridge deck closure construction of Qingshuitang Bridge.

求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信