{"title":"A Digital Twin-based Intelligent Concrete Placing Technology","authors":"Yongliang Zhu, Guo Zhong, Jianjiang Xu, Cui Huang","doi":"10.1002/cepa.3211","DOIUrl":null,"url":null,"abstract":"<div>\n \n <p>An intelligent concrete placing control model was created by the authors to achieve this goal. Using the placing and control content as the physical object (PO), a BIM virtual model as the twin carrier (VE), two-way twin data as the core (DD), coordinated control as the target (WM), and coordinated operational rules (RULE) as the driver. Additionally, they created a “IoT monitoring, BIM digitalization, dynamic analysis, and central control” integrated smart concrete transportation control platform for the construction of an ultra-high arch dam, as well as a smart monitoring device covering the entire transportation, spreading, and vibration of the entire concrete. As a result, the entire placement procedure can be intelligently managed. These achievements have been used to create excellent, safe, and effective concrete works for the Wudongde and Baihetan dams.</p>\n </div>","PeriodicalId":100223,"journal":{"name":"ce/papers","volume":"8 2","pages":"1224-1243"},"PeriodicalIF":0.0000,"publicationDate":"2025-03-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"ce/papers","FirstCategoryId":"1085","ListUrlMain":"https://onlinelibrary.wiley.com/doi/10.1002/cepa.3211","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
An intelligent concrete placing control model was created by the authors to achieve this goal. Using the placing and control content as the physical object (PO), a BIM virtual model as the twin carrier (VE), two-way twin data as the core (DD), coordinated control as the target (WM), and coordinated operational rules (RULE) as the driver. Additionally, they created a “IoT monitoring, BIM digitalization, dynamic analysis, and central control” integrated smart concrete transportation control platform for the construction of an ultra-high arch dam, as well as a smart monitoring device covering the entire transportation, spreading, and vibration of the entire concrete. As a result, the entire placement procedure can be intelligently managed. These achievements have been used to create excellent, safe, and effective concrete works for the Wudongde and Baihetan dams.