Economic evaluation of a strategy to shorten the time to surgery with neuraxial anaesthesia compared with usual clinical practice in patients on chronic antiplatelet therapy with a proximal femur fracture.

IF 1.6 Q3 HEALTH CARE SCIENCES & SERVICES
Frontiers in health services Pub Date : 2025-01-20 eCollection Date: 2024-01-01 DOI:10.3389/frhs.2024.1423975
Claudia Erika Delgado-Espinoza, Rosa Maria Antonijoan, Ignasi Gich, Rafael Anaya, Mireia Rodriguez, Angélica Millan, Jordi Llorca, Gemma Usua, Ana Ruiz, Angela Merchán-Galvis, Maria Jose Martinez-Zapata
{"title":"Economic evaluation of a strategy to shorten the time to surgery with neuraxial anaesthesia compared with usual clinical practice in patients on chronic antiplatelet therapy with a proximal femur fracture.","authors":"Claudia Erika Delgado-Espinoza, Rosa Maria Antonijoan, Ignasi Gich, Rafael Anaya, Mireia Rodriguez, Angélica Millan, Jordi Llorca, Gemma Usua, Ana Ruiz, Angela Merchán-Galvis, Maria Jose Martinez-Zapata","doi":"10.3389/frhs.2024.1423975","DOIUrl":null,"url":null,"abstract":"<p><strong>Introduction: </strong>Before implementing a new health care strategy, it is important to assess effectiveness but also to perform an economic evaluation. The goal of the present study was to perform a comparative economic evaluation of a new strategy aimed at using proposed implementation of the Plateletworks guidance (measurement of platelet function) with usual practice (delayed time to surgery) in patients on chronic antiplatelet treatment and scheduled for surgery with neuraxial anaesthesia due to proximal femur fracture.</p><p><strong>Methods: </strong>This is an economic evaluation carried out alongside a randomised controlled clinical trial at four centres in Spain. Patients were randomised to undergo either early platelet function-guided surgery (experimental group) or delayed surgery (control group). As AFFEcT trial results demonstrated significative difference between groups in the primary efficacy endpoint, the median time to surgery, a cost-effectiveness analysis was performed. Direct costs associated with hospitalisation until one-month post-discharge were considered and measured from a hospital perspective. All costs were reported in euros. Analyses were performed on a per protocol basis. Effectiveness outcome measures were the incremental cost and incremental cost per reduction in days to surgery. A deterministic sensitivity analysis was implemented to quantify uncertainty.</p><p><strong>Results: </strong>A total of 156 patients were randomized to the two groups (<i>n</i> = 78 per group). A total of 143 patients were included in the per protocol population (75 and 68 patients in the experimental and control groups, respectively). The median time to surgery was 2.30 days (IQR: 1.53-3.73) in the experimental group and 4.87 days (4.36-5.60) in the control group (a reduction of 2.40 days). Total costs during the 1-month study perioperative period were higher in the delayed surgery group (€18,495.19) than for the early surgery group (€16,497.59). The incremental cost was negative (€1,997.60), a statistically significant difference (<i>P</i> < 0.05). As measured by the reduction in time (days) to surgery, the incremental cost-effectiveness ratio (ICER) for early surgery was negative (777.28€/day). Sensitivity analysis demonstrated consistent cost saving.</p><p><strong>Conclusion: </strong>For patients on chronic antiplatelet treatment scheduled to undergo surgery for proximal femur fracture, an individualised strategy guided by a platelet function testing is a cost-saving and cost-effective strategy.</p>","PeriodicalId":73088,"journal":{"name":"Frontiers in health services","volume":"4 ","pages":"1423975"},"PeriodicalIF":1.6000,"publicationDate":"2025-01-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://www.ncbi.nlm.nih.gov/pmc/articles/PMC11788385/pdf/","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Frontiers in health services","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.3389/frhs.2024.1423975","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"2024/1/1 0:00:00","PubModel":"eCollection","JCR":"Q3","JCRName":"HEALTH CARE SCIENCES & SERVICES","Score":null,"Total":0}
引用次数: 0

Abstract

Introduction: Before implementing a new health care strategy, it is important to assess effectiveness but also to perform an economic evaluation. The goal of the present study was to perform a comparative economic evaluation of a new strategy aimed at using proposed implementation of the Plateletworks guidance (measurement of platelet function) with usual practice (delayed time to surgery) in patients on chronic antiplatelet treatment and scheduled for surgery with neuraxial anaesthesia due to proximal femur fracture.

Methods: This is an economic evaluation carried out alongside a randomised controlled clinical trial at four centres in Spain. Patients were randomised to undergo either early platelet function-guided surgery (experimental group) or delayed surgery (control group). As AFFEcT trial results demonstrated significative difference between groups in the primary efficacy endpoint, the median time to surgery, a cost-effectiveness analysis was performed. Direct costs associated with hospitalisation until one-month post-discharge were considered and measured from a hospital perspective. All costs were reported in euros. Analyses were performed on a per protocol basis. Effectiveness outcome measures were the incremental cost and incremental cost per reduction in days to surgery. A deterministic sensitivity analysis was implemented to quantify uncertainty.

Results: A total of 156 patients were randomized to the two groups (n = 78 per group). A total of 143 patients were included in the per protocol population (75 and 68 patients in the experimental and control groups, respectively). The median time to surgery was 2.30 days (IQR: 1.53-3.73) in the experimental group and 4.87 days (4.36-5.60) in the control group (a reduction of 2.40 days). Total costs during the 1-month study perioperative period were higher in the delayed surgery group (€18,495.19) than for the early surgery group (€16,497.59). The incremental cost was negative (€1,997.60), a statistically significant difference (P < 0.05). As measured by the reduction in time (days) to surgery, the incremental cost-effectiveness ratio (ICER) for early surgery was negative (777.28€/day). Sensitivity analysis demonstrated consistent cost saving.

Conclusion: For patients on chronic antiplatelet treatment scheduled to undergo surgery for proximal femur fracture, an individualised strategy guided by a platelet function testing is a cost-saving and cost-effective strategy.

求助全文
约1分钟内获得全文 求助全文
来源期刊
CiteScore
1.00
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信