{"title":"Two-agent proportionate flowshop scheduling with deadlines: polynomial-time optimization algorithms","authors":"Kuo-Ching Ying, Pourya Pourhejazy, Chuan-En Sung","doi":"10.1007/s10479-024-06275-z","DOIUrl":null,"url":null,"abstract":"<div><p>Volatility in the supply chain of critical products, notably the vaccine shortage during the pandemic, influences livelihoods and may lead to significant delays and long waiting times. Considering the capital- and time-intensive nature of capacity expansion plans, strategic operational production decisions are required best to address the supply-demand mismatches given the limited production resources. This research article investigates the production scenarios where the demand of one agent must be completed within a specified due date, hereinafter referred to as the <i>deadline</i>, while minimizing the maximum or total completion time of another agent's demand. For this purpose, the Two-Agent Proportionate Flowshop Scheduling Problem with deadlines is introduced. Two polynomial-time optimization algorithms are developed to solve these optimization problems. This study will serve as a basis for further developing this practical yet understudied scheduling problem.</p></div>","PeriodicalId":8215,"journal":{"name":"Annals of Operations Research","volume":"343 1","pages":"543 - 558"},"PeriodicalIF":4.4000,"publicationDate":"2024-09-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://link.springer.com/content/pdf/10.1007/s10479-024-06275-z.pdf","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Annals of Operations Research","FirstCategoryId":"91","ListUrlMain":"https://link.springer.com/article/10.1007/s10479-024-06275-z","RegionNum":3,"RegionCategory":"管理学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"OPERATIONS RESEARCH & MANAGEMENT SCIENCE","Score":null,"Total":0}
引用次数: 0
Abstract
Volatility in the supply chain of critical products, notably the vaccine shortage during the pandemic, influences livelihoods and may lead to significant delays and long waiting times. Considering the capital- and time-intensive nature of capacity expansion plans, strategic operational production decisions are required best to address the supply-demand mismatches given the limited production resources. This research article investigates the production scenarios where the demand of one agent must be completed within a specified due date, hereinafter referred to as the deadline, while minimizing the maximum or total completion time of another agent's demand. For this purpose, the Two-Agent Proportionate Flowshop Scheduling Problem with deadlines is introduced. Two polynomial-time optimization algorithms are developed to solve these optimization problems. This study will serve as a basis for further developing this practical yet understudied scheduling problem.
期刊介绍:
The Annals of Operations Research publishes peer-reviewed original articles dealing with key aspects of operations research, including theory, practice, and computation. The journal publishes full-length research articles, short notes, expositions and surveys, reports on computational studies, and case studies that present new and innovative practical applications.
In addition to regular issues, the journal publishes periodic special volumes that focus on defined fields of operations research, ranging from the highly theoretical to the algorithmic and the applied. These volumes have one or more Guest Editors who are responsible for collecting the papers and overseeing the refereeing process.