Complexity in sports facility construction projects

J C Ørke, O Torp, T O Malvik
{"title":"Complexity in sports facility construction projects","authors":"J C Ørke, O Torp, T O Malvik","doi":"10.1088/1755-1315/1389/1/012030","DOIUrl":null,"url":null,"abstract":"Sports facilities in Norway are often built by sports clubs. In such cases, the project team often lack competence and experience with planning, design, and construction. Complexity is a challenge in many construction projects and is frequently used to explain why projects went wrong. It is, therefore, relevant to assess the magnitude of complexity in sports facility projects and how this complexity should be managed. Such insight will help project teams carry out successful sports facility projects, ensuring the best use of the available resources and as much utility value as possible for the sports community. The purpose of the research was to increase knowledge about complexity in the management of sports facility projects. The paper was based on “model sports facilities” from the website godeidrettsanlegg.no. A workshop, a literature review and a survey were conducted. As a result, the Project Complexity and Risk Assessment tool was found to be a suitable framework for internal measurement of complexity, while simpler frameworks might be more suitable for external, statistical use. Our study indicates that sports facility construction projects have a high level of complexity. Lacking qualifications seems to be a cause of this, indicating that ensuring sufficient qualifications in project management is one of the best measures to handle the complexity.","PeriodicalId":14556,"journal":{"name":"IOP Conference Series: Earth and Environmental Science","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2024-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"IOP Conference Series: Earth and Environmental Science","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1088/1755-1315/1389/1/012030","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Sports facilities in Norway are often built by sports clubs. In such cases, the project team often lack competence and experience with planning, design, and construction. Complexity is a challenge in many construction projects and is frequently used to explain why projects went wrong. It is, therefore, relevant to assess the magnitude of complexity in sports facility projects and how this complexity should be managed. Such insight will help project teams carry out successful sports facility projects, ensuring the best use of the available resources and as much utility value as possible for the sports community. The purpose of the research was to increase knowledge about complexity in the management of sports facility projects. The paper was based on “model sports facilities” from the website godeidrettsanlegg.no. A workshop, a literature review and a survey were conducted. As a result, the Project Complexity and Risk Assessment tool was found to be a suitable framework for internal measurement of complexity, while simpler frameworks might be more suitable for external, statistical use. Our study indicates that sports facility construction projects have a high level of complexity. Lacking qualifications seems to be a cause of this, indicating that ensuring sufficient qualifications in project management is one of the best measures to handle the complexity.
体育设施建设项目的复杂性
挪威的体育设施通常由体育俱乐部建造。在这种情况下,项目团队往往缺乏规划、设计和施工方面的能力和经验。复杂性是许多建筑项目面临的挑战,经常被用来解释项目出错的原因。因此,评估体育设施项目的复杂程度以及应如何管理这种复杂性具有现实意义。这种洞察力将有助于项目团队成功实施体育设施项目,确保现有资源得到最佳利用,并为体育界带来尽可能多的实用价值。研究的目的是增加对体育设施项目管理复杂性的了解。论文以 godeidrettsanlegg.no 网站上的 "体育设施模型 "为基础。我们举办了一次研讨会、进行了一次文献综述和一项调查。结果发现,"项目复杂性和风险评估 "工具是一个适合内部测量复杂性的框架,而更简单的框架可能更适合外部统计使用。我们的研究表明,体育设施建设项目的复杂程度很高。缺乏资质似乎是造成这种情况的一个原因,这表明确保在项目管理方面有足够的资质是应对复杂性的最佳措施之一。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
CiteScore
1.00
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信