The Impacts of the Tampere Tramway Project

Terttu Vainio, Eero Nippala
{"title":"The Impacts of the Tampere Tramway Project","authors":"Terttu Vainio, Eero Nippala","doi":"10.1088/1755-1315/1389/1/012033","DOIUrl":null,"url":null,"abstract":"Light Rail transport within the city has become an interesting form of public transport in many cities in Europe as well as in other parts of the world. According to the experience of the reference cities, light rail or tramway is primarily an urban development project, not only a public transport project. This case study focuses on the indirect impacts of a tramway project. Do they really happen or is their valuation just a means to achieve political will. The city of Tampere is one of a few growing cities in Finland. The growth of the city caused congestion in the city centre, where the bus lines either ended or whose pendulum lines passed. Project planning for the Tampere tramway started in the early 2000s, construction began in 2017, traffic on the first lines started in 2021. In the tramway, the decisions are based on future expectations. In our research, we assess how well these expectations have been realised in the Tampere tramway project by means of a literature survey and statistical comparisons. The developments to be considered are the direct and indirect investments in the construction of the tramway, the demographic changes, and the housing markets. The evaluation material consists of official regional statistics. According to evaluation, the land use of Tampere has become more efficient than expected in the area affected by the tramway. Not only on empty plots, but also old low commercial buildings have been replaced by high new residential buildings. The tramway has supported urban development by attracting investors to build on previously for abandoned plots. The main street of Tampere is dedicated to the tram, a limited number of buses and light traffic, so congestion has been reduced.","PeriodicalId":14556,"journal":{"name":"IOP Conference Series: Earth and Environmental Science","volume":"50 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2024-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"IOP Conference Series: Earth and Environmental Science","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1088/1755-1315/1389/1/012033","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Light Rail transport within the city has become an interesting form of public transport in many cities in Europe as well as in other parts of the world. According to the experience of the reference cities, light rail or tramway is primarily an urban development project, not only a public transport project. This case study focuses on the indirect impacts of a tramway project. Do they really happen or is their valuation just a means to achieve political will. The city of Tampere is one of a few growing cities in Finland. The growth of the city caused congestion in the city centre, where the bus lines either ended or whose pendulum lines passed. Project planning for the Tampere tramway started in the early 2000s, construction began in 2017, traffic on the first lines started in 2021. In the tramway, the decisions are based on future expectations. In our research, we assess how well these expectations have been realised in the Tampere tramway project by means of a literature survey and statistical comparisons. The developments to be considered are the direct and indirect investments in the construction of the tramway, the demographic changes, and the housing markets. The evaluation material consists of official regional statistics. According to evaluation, the land use of Tampere has become more efficient than expected in the area affected by the tramway. Not only on empty plots, but also old low commercial buildings have been replaced by high new residential buildings. The tramway has supported urban development by attracting investors to build on previously for abandoned plots. The main street of Tampere is dedicated to the tram, a limited number of buses and light traffic, so congestion has been reduced.
坦佩雷有轨电车项目的影响
在欧洲和世界其他地区的许多城市,市内轻轨交通已成为一种令人关注的公共交通形式。根据参考城市的经验,轻轨或有轨电车主要是一个城市发展项目,而不仅仅是一个公共交通项目。本案例研究的重点是有轨电车项目的间接影响。这些影响是否真的会发生,抑或对它们的评估只是实现政治意愿的一种手段。坦佩雷市是芬兰少数几个不断发展的城市之一。城市的发展造成了市中心的拥堵,公交线路要么在市中心终止,要么其摆式线路在市中心经过。坦佩雷有轨电车的项目规划始于 2000 年代初,建设始于 2017 年,首批线路于 2021 年开始通车。有轨电车的决策是基于对未来的预期。在研究中,我们通过文献调查和统计比较来评估这些预期在坦佩雷有轨电车项目中的实现程度。需要考虑的发展情况包括对有轨电车建设的直接和间接投资、人口变化和住房市场。评估材料包括地区官方统计数据。根据评估结果,坦佩雷市受有轨电车影响地区的土地使用效率比预期的要高。不仅是空地,旧的低矮商业建筑也被新的高层住宅所取代。有轨电车通过吸引投资者在以前废弃的地块上进行建设,支持了城市发展。坦佩雷的主要街道专门用于电车、数量有限的公共汽车和轻型交通,因此减少了拥堵。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
CiteScore
1.00
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信