OA14 - BOWSTRING OF THE NEW RAILWAY LINE LUXEMBOURG-BETTEMBOURG – CONSTRUCTION AND SPECIAL DESIGN CHALLENGES FOR HANGERS

ce/papers Pub Date : 2024-09-11 DOI:10.1002/cepa.3056
Patrick NOSBUSCH, Ettore SCIAN, Andrea DE CILLIA
{"title":"OA14 - BOWSTRING OF THE NEW RAILWAY LINE LUXEMBOURG-BETTEMBOURG – CONSTRUCTION AND SPECIAL DESIGN CHALLENGES FOR HANGERS","authors":"Patrick NOSBUSCH,&nbsp;Ettore SCIAN,&nbsp;Andrea DE CILLIA","doi":"10.1002/cepa.3056","DOIUrl":null,"url":null,"abstract":"<p>The new railway line connecting Luxembourg and Bettembourg crosses the A3 highway at a steep angle (19.5°) with the bridge called OA14.</p><p>The designed bridge is a bowstring structure with a single span of 186.85 meters. The bridge deck consists of two lateral metal box girders acting as a chord. The deck is a transversal filler beam, with spherical voids and lightweight concrete to reduce the structure's weight.</p><p>The bridge features two inward-inclined arches at 9°, which are doubled and serve as trusses. This significantly increases the stiffness of the arch whilst keeping the silhouette elegant. The deck follows the curved track alignment, the arches remain straight. Two times 12 hangers connect the arches to the girders, they are made of CHS profiles of S450H quality. This article gives an overview of the structure and its construction. It then gives a more detailed insight in the design of the hangers, especially the hanger-girder connections.</p>","PeriodicalId":100223,"journal":{"name":"ce/papers","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2024-09-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"ce/papers","FirstCategoryId":"1085","ListUrlMain":"https://onlinelibrary.wiley.com/doi/10.1002/cepa.3056","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The new railway line connecting Luxembourg and Bettembourg crosses the A3 highway at a steep angle (19.5°) with the bridge called OA14.

The designed bridge is a bowstring structure with a single span of 186.85 meters. The bridge deck consists of two lateral metal box girders acting as a chord. The deck is a transversal filler beam, with spherical voids and lightweight concrete to reduce the structure's weight.

The bridge features two inward-inclined arches at 9°, which are doubled and serve as trusses. This significantly increases the stiffness of the arch whilst keeping the silhouette elegant. The deck follows the curved track alignment, the arches remain straight. Two times 12 hangers connect the arches to the girders, they are made of CHS profiles of S450H quality. This article gives an overview of the structure and its construction. It then gives a more detailed insight in the design of the hangers, especially the hanger-girder connections.

OA14 - 卢森堡-贝敦堡新铁路线的弓弦 - 施工和吊架的特殊设计挑战
连接卢森堡和贝敦堡的新铁路线以陡峭的角度(19.5°)穿过 A3 高速公路,桥梁名为 OA14。桥面由两根横向金属箱梁组成,作为弦杆。桥面为横向填充梁,采用球形空隙和轻质混凝土,以减轻结构重量。该桥的两个内倾拱呈 9°,双层作为桁架。这大大增加了拱的刚度,同时保持了优雅的轮廓。桥面沿着弯曲的轨道排列,拱门则保持直线。两根共 12 根的吊架将拱门与大梁连接起来,吊架由 S450H 质量的 CHS 型材制成。本文概述了该结构及其构造。然后详细介绍了支吊架的设计,尤其是支吊架与大梁的连接。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
文献相关原料
公司名称 产品信息 采购帮参考价格
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信