Preliminary design of a viaduct on new Highspeed line RS2 VRT Jižní Morava

ce/papers Pub Date : 2024-09-11 DOI:10.1002/cepa.3061
Samuel Franko, Martin Hukel
{"title":"Preliminary design of a viaduct on new Highspeed line RS2 VRT Jižní Morava","authors":"Samuel Franko,&nbsp;Martin Hukel","doi":"10.1002/cepa.3061","DOIUrl":null,"url":null,"abstract":"<p>The newly proposed high-speed rail in Czech Republic creates a set of new challenges for engineers in design overall. In this case, the most significant challenge was to design a viaduct over several obstacles due to the crossing of Special Area of Conservation (SAC), part of Natura 2000. This aims to limit impacts in short-term, during construction and more importantly in the long term. Construction of the viaduct will mitigate an impact to the natural surrounding area, whilst allowing immigration of its natural habitats. Nevertheless, the viaduct design and operational speeds will reach 320 km/h with possible raising to 350 km/h limit, with minimal impact within the area.</p><p>Initial length of the viaduct was over 1 300 m and the main requirement given by an infrastructure manager was to design a viaduct without railway expansion joints. Due to such a long distance, the viaduct had to be separated into several dilatation segments in order to avoid the use of rail expansion joint. The most susceptible parts of SAC were in proximity of the river Šatava and surrounding wetlands. This area created an obstacle, which had to be crossed by a long span avoiding the implementation of bridge piers. Poor geological conditions close to the watercourse had to be taken into consideration for design of pier foundation, therefore the span had to be shortened to a compromised length.</p><p>The final design of the viaduct consists of 16 segments, of which 14 are continuous segments and 4 are single spans. Overall, there are 29 spans over the length of the viaduct. Construction method of incremental launching had been chosen to reduce the short-term impact in the SAC.</p>","PeriodicalId":100223,"journal":{"name":"ce/papers","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2024-09-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"ce/papers","FirstCategoryId":"1085","ListUrlMain":"https://onlinelibrary.wiley.com/doi/10.1002/cepa.3061","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The newly proposed high-speed rail in Czech Republic creates a set of new challenges for engineers in design overall. In this case, the most significant challenge was to design a viaduct over several obstacles due to the crossing of Special Area of Conservation (SAC), part of Natura 2000. This aims to limit impacts in short-term, during construction and more importantly in the long term. Construction of the viaduct will mitigate an impact to the natural surrounding area, whilst allowing immigration of its natural habitats. Nevertheless, the viaduct design and operational speeds will reach 320 km/h with possible raising to 350 km/h limit, with minimal impact within the area.

Initial length of the viaduct was over 1 300 m and the main requirement given by an infrastructure manager was to design a viaduct without railway expansion joints. Due to such a long distance, the viaduct had to be separated into several dilatation segments in order to avoid the use of rail expansion joint. The most susceptible parts of SAC were in proximity of the river Šatava and surrounding wetlands. This area created an obstacle, which had to be crossed by a long span avoiding the implementation of bridge piers. Poor geological conditions close to the watercourse had to be taken into consideration for design of pier foundation, therefore the span had to be shortened to a compromised length.

The final design of the viaduct consists of 16 segments, of which 14 are continuous segments and 4 are single spans. Overall, there are 29 spans over the length of the viaduct. Construction method of incremental launching had been chosen to reduce the short-term impact in the SAC.

新高速线路 RS2 VRT Jižní Morava 高架桥的初步设计
捷克共和国新提议的高速铁路为工程师的整体设计带来了一系列新的挑战。在这种情况下,最重要的挑战是设计一座跨越数个障碍的高架桥,因为要穿越特别保护区(SAC),这是 "自然 2000"(Natura 2000)的一部分。这样做的目的是限制施工期间的短期影响,更重要的是限制长期影响。高架桥的建设将减轻对周围自然环境的影响,同时允许自然栖息地的移民。尽管如此,高架桥的设计和运营速度将达到 320 公里/小时,并有可能提高到 350 公里/小时,而对该地区的影响却微乎其微。高架桥最初的长度超过 1300 米,基础设施经理提出的主要要求是设计一座没有铁路伸缩缝的高架桥。由于距离如此之长,为了避免使用铁路伸缩缝,高架桥必须分成几个扩张段。萨塔瓦高架桥最易受影响的部分位于萨塔瓦河及周边湿地附近。这一区域造成了障碍,必须通过大跨度跨越,避免使用桥墩。在设计桥墩地基时,必须考虑到河道附近不良的地质条件,因此必须缩短跨度。高架桥全长共有 29 跨。为了减少对南部非洲发展区的短期影响,我们选择了逐步下水的施工方法。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
文献相关原料
公司名称 产品信息 采购帮参考价格
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信