Improving Lead Time through Lean Manufacturing: A Case Study

Ülge Taş
{"title":"Improving Lead Time through Lean Manufacturing: A Case Study","authors":"Ülge Taş","doi":"10.34248/bsengineering.1489166","DOIUrl":null,"url":null,"abstract":"Lean manufacturing is a well-established methodology aimed at optimizing production by eliminating waste, enabling industries to thrive in a globally competitive environment. This paper presents a case study of a well-known automotive manufacturing industry on the axle process. This article aims the Value Stream Mapping (VSM) methodology was used in the axle process to reduce lead time by producing quality products with a reduction in non-value-added activities. The current state of the axle process was created using industry data from the past six months. Significant improvements were realized following the successful implementation of VSM, including a reduction in the lead time from 89.50 hours to 50.55 hours. The new state map was also created after implementing the improvements. The results illustrated that the VSM increased the effectiveness by 56.48% in the axle process.","PeriodicalId":495872,"journal":{"name":"Black sea journal of engineering and science","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2024-07-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Black sea journal of engineering and science","FirstCategoryId":"0","ListUrlMain":"https://doi.org/10.34248/bsengineering.1489166","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Lean manufacturing is a well-established methodology aimed at optimizing production by eliminating waste, enabling industries to thrive in a globally competitive environment. This paper presents a case study of a well-known automotive manufacturing industry on the axle process. This article aims the Value Stream Mapping (VSM) methodology was used in the axle process to reduce lead time by producing quality products with a reduction in non-value-added activities. The current state of the axle process was created using industry data from the past six months. Significant improvements were realized following the successful implementation of VSM, including a reduction in the lead time from 89.50 hours to 50.55 hours. The new state map was also created after implementing the improvements. The results illustrated that the VSM increased the effectiveness by 56.48% in the axle process.
通过精益生产缩短交货时间:案例研究
精益生产是一种行之有效的方法,旨在通过消除浪费优化生产,使各行业在全球竞争环境中蓬勃发展。本文介绍了一个知名汽车制造业车轴流程的案例研究。本文旨在将价值流图(VSM)方法应用于车轴流程,通过减少非增值活动来生产优质产品,从而缩短交付周期。车桥流程的现状是利用过去六个月的行业数据绘制的。在成功实施 VSM 后,实现了重大改进,包括将交付周期从 89.50 小时缩短到 50.55 小时。新的状态图也是在实施改进后绘制的。结果表明,VSM 使车轴流程的效率提高了 56.48%。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信